Road resurfacing

There are currently ongoing road resurfacing works taking place throughout the Vale of Glamorgan. View road resurfacing programme.|

 

Subscribe to ValeConnect

Sign up to the Council's free newsletter service ValeConnect| and we'll let you know when the latest roadworks and road closures are available to view online:

 

 

Temporary Traffic Control

 

Friars Road, Barry Island - Outside former Marine Hotel, Public Hotel

Date: 09/06/14 - 01/08/14

Contractor: Pendragon Design Ltd

Details: Carriageway width restrictions will be in place to allow for works to be carried out on the new development. 

Albert Road, Penarth from the junction of Plassey St and Pembrook Terrace

Date: 21/07/14 - 29/08/14

Contractor: Vale of Glamorgan Council Highway and Engineering Unit and LGA Contracting Ltd 

Details: Temporary footway restrictions will be in place to allow for footway improvement works to take place.

Ham Lane East, Llantwit Major between the junction of Boverton Road and Ham Lane South

Date: 21/07/14 - 29/08/14

Contractor: Vale of Glamorgan Council Highways and Engineering Unit and LGA Contracting Ltd

Details:  Temporary footway restrictions will be in place to allow for footway improvement works to take place

B4265 from Gileston Cross to The Old Mill, St Athan

Date: 27/01/14 - 28/11/14

Contractor: Vale of Glamorgan Council Highways and Engineering Unit in association with Alan Griffiths Ltd

Details: Temporary traffic control will be in operation to allow for highway improvement works to take place including improving the geometry of the existing carriageway and a new structure to support the existing pipe bridge. There will be some disruption to road users and every effort will be made to keep this to an absolute minimum. 30mph speed restriction in operation. Please note: that it is not permitted for vehicles to use the Esso Garage as a short cut to avoid these signals.

Beach Road, Penarth

Date: 04/07/14 - 01/08/14

Contractor: Morgan Sindall

Details: Minor restrictions will be in place to the north of Bridgeman Road to allow for essential Welsh Water works to take place.

Jenner Park School, Barry Road   

Date: 21/07/14 - 08/08/14   

Contractor: Vale of Glamorgan Council Highways and Engineering Unit and LGA Contracting Ltd

Details: Temporary traffic control with footway restrictions to allow for the upgrading of the zebra crossing   

Beach Road, Penarth   

Date: 21/07/14 - 01/08/14   

Contractor: Vale of Glamorgan Councils Highways and Engineering Unit

Details: Temporary pedestrian crossing will be in place to allow for essential maintenance works to take place.    

Sully Moors Road   

Date: 26/07/14 - 26/07/14   

Contractor: Welsh Water

Details: Temporary Traffic Control will be in place to allow for essential resurfacing works

Vale Show, Fonmon Castle   

Date: 13/08/14 - 13/08/14   

Contractor: Vale of Glamorgan Council

Details: Possible traffic congestion in local area

Porthkerry Road Barry - Junction Trinity Street to Wenvoe Terrace

Date: 30/07/14 - 04/08/14

Contractor: Vale of Glamorgan Councils Highways and Engineering Unit and Tarmac National Contracting Ltd
Details: Temporary road closure will be in place to allow for resurfacing works to take place    

Romilly Park Road Barry

Date: 01/08/14    - 08/08/14  

Contractor: Vale of Glamorgan Councils Highways and Engineering Unit and Tarmac National Contracting Ltd
Details: Temporary traffic control will be in place to allow for resurfacing works to take place

 

 

 

Road Closures

High Street, Llantwit Major

Date: 24/07/14 - 29/07/14

Contractor: Vale of Glamorgan Council Highways and Engineering Unit and Tarmac Contracting Ltd

Details: Temporary road closure will be in place to allow for re-surfacing works to take place

Abbey Road, Corntown

Date: 21/07/14 - 28/07/14

Contractor: Vale of Glamorgan Council Highways and Engineering Unit and Tarmac National Contracting Ltd

Details: Temporary road closure will be in place to allow for resurfacing works to take place

Chapel Road Broughton closed at junction with West Street / West Street Broughton between Chapel Road and Water Street   

Date: 28/07/14 - 01/08/14  

Contractor: Western Power Distribution

Details: Temporary road closure to allow electrical connection work to take place  

Winston Road Barry   

Date: 28/07/14    - 01/08/14   

Contractor: Vale of Glamorgan Councils Highways and Engineering Unit and Tarmac National Contracting Ltd
Details: Temporary road closure will be in place to allow for resurfacing works to take place