PLANNING COMMITTEE

 

Minutes of a meeting held on 25th July, 2013.

 

Present: Councillor F.T. Johnson (Chairman); Councillors Mrs. M.R. Wilkinson (Vice-Chairman); Councillors J.C. Bird, Ms. B.E. Brooks, Mrs. P. Drake, J. Drysdale, E. Hacker, N.P. Hodges, H.J.W. James, Mrs. M. Kelly Owen, K.P. Mahoney, A. Parker, R.A. Penrose, A.G. Powell, Mrs. A.J. Preston and E. Williams.

 

 

307     APOLOGIES FOR ABSENCE -

 

These were received from Councillors Mrs. M.E.J. Birch, Ms. R. Birch, Mrs. V.M. Hartrey, K. Hatton and M.R. Wilson.

 

 

308     MINUTES -

 

RESOLVED - T H A T the minutes of the meeting held on 4th July, 2013 be approved as a correct record.

 

 

309     DECLARATIONS OF INTEREST -

 

No declarations were received.

 

 

310     PROPOSED REVIEW AND CONSULTATION ON SUPPLEMENTARY PLANNING GUIDANCE - AFFORDABLE HOUSING (REF) -

 

The above matter had been previously considered by the Cabinet at its meeting held on 1st July, 2013 (Min. No. C1389 refers).  The report sought Cabinet’s approval for a revised Supplementary Planning Guidance in respect of Affordable Housing provision in the Vale of Glamorgan which would be subject to a public consultation exercise.

 

In 2010 the Council commissioned Three Dragons to undertake an Affordable Housing Viability Assessment (AHVA 2010) to examine the economically viable levels of affordable housing that could be sought through the planning system within the Vale of Glamorgan.

 

The AHVA identified a marked viability divide between the Rural South and Coast and Barry (West and East); and on the other hand the sub markets of Penarth, Rural and East Vale where site viability provided greater opportunities for the delivery of affordable housing.

 

In view of the findings of the AHVA the revised SPG proposed the adoption of a standard site threshold across the Vale of Glamorgan, in combination with a two tier contribution requirement to reflect the levels of viability found within the housing submarket areas. Additionally, the revised SPG attached at (Appendix 1) to the report proposed a flexible approach to meeting affordable housing need by allowing an element of off site affordable housing contributions where appropriate to meet affordable housing within areas where the need was greater.

 

In the housing sub market areas of Barry (East and West)  and Rural South and Coast, the Council required development proposals of five or more units (or 0.15 hectares) to provide as a minimum 30% on site affordable housing.

 

In the Housing sub market areas of the East Vale, Penarth and Rural Vale, the Council required development proposals of five or more units (or 0.15 hectare) to provide as a minimum 35% affordable housing.

 

In the East Vale and Rural Vale Housing Sub Markets an element of off site contribution towards the delivery of affordable housing may be acceptable, where it was demonstrated that appropriate alternative sites were available to deliver affordable housing in a timely manner elsewhere.

 

It was considered that this approach would allow the Council to secure affordable housing more strategically than previously, provide for a clear and consistent policy framework across the authority, whilst setting contributions within the thresholds identified in the AHVA in recognition of the current economic climate.

 

The SPG proposed that the implementation of the affordable housing requirements would be determined against the relevant sub housing market area postcodes taken from the AHVA within which the development was proposed.  To assist proposers of new development, the SPG included a map that identified the six submarket areas and a table containing the relevant postcodes for each submarket. This would also complement the approach currently being developed by the Council in preparing its Community Infrastructure Levy (CIL).

 

In accordance with the Council's procedures for the preparation of SPG's, a four week consultation would be undertaken on the proposed changes.  This would involve directly inviting relevant interested parties such as Registered Social Landlords (RSL), the Home Builders Federation and agents to comment on the revised SPG.  Following consultation, a summary of the comments and any subsequent proposed changes to the draft SPG, including a recommendation to adopt the SPG would be reported to Cabinet.

 

Having given consideration to the above matter it was

 

RESOLVED – T H A T the proposed review and consultation on Supplementary Planning Guidance – Affordable Housing be endorsed.  

 

Reason for decision

 

To allow the proposed SPG to be consulted upon and subsequently implemented.

 

 

311     ENERGY AND CLIMATE CHANGE COMMONS' SELECT COMMITTEE SECOND REPORT - A SEVERN BARRAGE? (REF) -

 

The above matter had been previously considered by the Cabinet at its meeting held on 15th July, 2013 (Min. No. C1414 refers).  Cabinet at that time were informed of the outcome of the Energy and Climate Change Commons' Select Committee's public consultation into the potential for a privately financed Severn Barrage.  The matter had been referred by the Cabinet to the Planning Committee to advise them of the outcome of the Select Committee's public consultation exercise into the potential for a Severn Barrage. 

 

RESOLVED - T H A T the content of the Cabinet Report be noted.

 

Reason for decision

 

In acknowledgement of the outcome of the Energy and Climate Change Commons' Select Committee's public consultation exercise into the potential for a privately financed Severn Barrage.

 

 

312     SITE INSPECTION (MD) -

 

RESOLVED - T H A T the attendance of the following Councillors at the site indicated below on 4th July, 2013 be noted:

 

Apologies for absence were received from Councillors E. Hacker, Mrs. A.J. Preston, Mrs. M.R. Wilkinson and E. Williams.

 

(a)     Land off Port Road, Culverhouse Cross (former HTV Studios)

Councillor F.T. Johnson (Chairman); Councillors J.C. Bird, Mrs. P. Drake, Mrs. V.M. Hartrey, K. Hatton, H.J.W. James, Mrs. M. Kelly Owen, K.P. Mahoney, A. Parker and R.A. Penrose.

 

 

313     BUILDING REGULATION APPLICATIONS AND OTHER BUILDING CONTROL MATTERS DETERMINED BY THE DIRECTOR UNDER DELEGATED POWERS (DDS) -

 

RESOLVED -

 

(1)       T H A T the Building Regulation Applications as listed in the report be noted.

 

(2)       T H A T the service of Notices under the Buildings (Approved Inspectors Etc) Regulations 2000 as listed in the report be noted.

 

 

314     PLANNING APPLICATIONS DETERMINED BY THE DIRECTOR UNDER DELEGATED POWERS (DDS) -

 

RESOLVED - T H A T the report on the following applications determined under delegated powers be noted:

 

Decision Codes

 

A    -    Approved

C    -    Unclear if permitted (PN)

EB      EIA (Scoping) Further information required

EN      EIA (Screening) Not Required

F     -    Prior approval required (PN)

H    -    Allowed : Agricultural Condition Imposed : Appeals

J     -    Determined by NAfW

L     -    Approved AND refused (LAW)

P    -    Permittal (OBS - no objections)

R    -    Refused

 

O     -    Outstanding (approved subject to the approval of Cadw OR to a prior agreement

B     -    No observations (OBS)

E          Split Decision

G     -    Approved the further information following 'F' above (PN)

N     -    Non permittal (OBS - objections)

Q     -    Referred to Secretary of State for Wales (HAZ)

S     -    Special observations (OBS)

U     -    Undetermined

RE  -    Refused (Enforcement Unit Attention)

V     -    Variation of condition(s) approved

 

 

2010/00976/FUL

 

A

 

Hawthorns, Gadlys Lane, Llanmaes

 

Construction of replacement wall in natural stone.

 

 

2013/00208/FUL

 

A

 

Tudor Lodge, Bonvilston

 

Construction / retention of a timber clad single storey storage block to include equine related tack room and feed store, plus a store for field maintenance vehicles (tractor etc). 

 

 

2013/00232/ADV

 

A

 

Tesco Stores Ltd., Marconi Avenue, Penarth

 

Various advertisements at site.

 

 

2013/00317/FUL

 

A

 

Tesco Stores Ltd., Marconi Avenue, Penarth

 

Installation of a timber fence surrounding the hello tablet signage and the upgrade of 11 trolley bays.

 

 

2013/00346/FUL

 

A

 

Fron, Wellwood Drive, Dinas Powys

 

Construction of new two-storey rear elevation extension with associated internal and external works to residential property including partial attic conversion and ground works.

 

 

2013/00353/FUL

 

A

 

Land adjoining White Farm, Merthyr Dyfan, Barry

 

Re-plan application for revisions/repositioning relating to 15 housing plots approved under reserved matters application ref. 2010/00123/RES.

 

 

2013/00360/FUL

 

A

 

3, The Limes, Cowbridge

 

Small single storey extension to garage.

 

 

2013/00381/ADV

 

A

 

Budgens Stores Ltd., 36, Cardiff Road,

Dinas Powys

 

The installation of an ATM installed through existing brickwork. ATM facia with internally illuminated light blue Cash sign to the top of the ATM facia.  ATM Cash zone non illuminated surround in dark blue and light blue medite polycarbonate.

 

 

2013/00382/FUL

 

A

 

Wayside Cottage, Dyffryn

 

Extension and loft conversion of existing bungalow.

 

 

2013/00384/FUL

 

A

 

29, Holton Road, Barry

 

Proposed change of use from A1 (shops) to A3 (restaurants, cafes and hot food takeaways).

 

 

2013/00385/FUL

 

A

 

6, Orchard Close, Wenvoe

 

Erection of conservatory to rear and erection of replacement boundary wall 2m in height.

 

 

2013/00388/FUL

 

A

 

Pear Tree Cottage, Marcross

 

Alterations and sub division of premises for creation of self contained holiday cottage.

 

 

2013/00390/FUL

 

A

 

Ex. Servicemen's Club, 69, Windsor Road, Penarth

 

Alterations to front elevation to introduce doors and windows and new railings and part wall to front perimeter.

 

 

2013/00391/FUL

 

A

 

The Common, Dinas Powys

 

Levelling, to include drainage, of the training area of Dinas Powys R.F.C.

 

 

2013/00393/FUL

 

A

 

51, Plas Taliesin, Penarth

 

Conversion of existing integral garage into habitable room, replacing existing garage door with new trifold door.

 

 

2013/00395/FUL

 

A

 

Flat 5, 25, Victoria Square, Penarth

 

Attic bathroom extension.

 

 

2013/00406/FUL

 

A

 

61, Plymouth Road, Penarth

 

Conversion of two flats back to a single family home.  This will include demolition of the lean to structure and external staircase to the rear, building a new single storey rear dining room extension, and internal layout alterations.

 

 

2013/00407/FUL

 

A

 

11, Court Close, Aberthin

 

Deletion of Condition 2 of planning permission reference 2010/00600/FUL, to remove requirement of screen to front balcony.

 

 

2013/00410/FUL

 

A

 

44, Millfield Drive, Cowbridge

 

An extension at the front of the house, matching that already built by the adjoining neighbours.

 

 

2013/00414/ADV

 

A

 

Lloyds TSB Bank Plc, 1, Windsor Road, Penarth

 

3x non illuminated letters; 2x externally illuminated projecting sign; 2x externally non illuminated name plates; 2x internally non illuminated applied vinyls; 1x externally non illuminated applied vinyl.

 

 

2013/00415/LBC

 

A

 

Lloyds TSB Bank Plc, 1, Windsor Road, Penarth

 

Three non illuminated letters; two externally illuminated projector signs; two externally non illuminated name plates; two internally non illuminated applied vinyls; one externally non illuminated applied vinyl.

 

 

2013/00418/FUL

 

A

 

13, Coed y Felin, Barry

 

Garden shed.

 

 

2013/00434/FUL

 

A

 

90, Winston Road, Barry

 

Conversion of existing dwelling to create two number two bedroom self contained flats.

 

 

2013/00435/FUL

 

A

 

53, Picton Road, Rhoose

 

Create first floor side extension above existing converted garage and convert loft with dormer extension.

 

 

2013/00443/ADV

 

A

 

R. S. Bird Ltd., Birds Lane, Cowbridge

 

One (revised) profile sign over entrance to alleyway from High Street to Birds Lane.

 

 

2013/00445/FUL

 

A

 

Budgens Stores Ltd., 36, Cardiff Road, Dinas Powys

 

The installation of an ATM installed through existing brickwork. ATM facia with internally illuminated light blue Cash sign to the top of the ATM facia.  ATM Cash zone non illuminated surround in dark blue and light blue medite polycarbonate.

 

 

2013/00449/FUL

 

A

 

5, Speedwell Drive, Rhoose

 

Orangery extension to replace existing conservatory.

 

 

2013/00492/PNA

 

R

 

Tynewydd y Bryn, Peterston Super Ely

 

Mono pitched timber clad agricultural building.

 

 

2010/01199/FUL

 

A

 

7, Paget Road, Barry

 

Conversion of part of ground floor and  lower ground floor into a self contained 2 bedroom flat.  Retention of part of the ground floor for a sales kiosk fronting onto Paget Road with retained existing A3 use.

 

 

2012/01036/FUL

 

A

 

Land at rear of Kingsland Crescent and Merthyr Street, Barry

 

Erection of two semi detached dwellings.

 

 

2013/00401/FUL

 

A

 

26, Melyn y Gors, Barry

 

Demolition of garage and construction of one new dwelling and garage.

 

 

2013/00416/FUL

 

A

 

49, Llanmead Gardens, Rhoose

 

Rear box dormer to proposed loft conversion at existing domestic dwelling.

 

 

2013/00425/FUL

 

A

 

OS Field Parcel 0946, North of Newton House, Newton, Near Cowbridge

 

Stable block with concrete apron to front.

 

 

2013/00441/ADV

 

R

 

Whitton Cross, Junction 5 Mile Lane and Walterston Road

 

Advertisement and off-site signage.

 

 

2013/00457/FUL

 

A

 

61, Trebeferad, Boverton, Llantwit Major

 

Extension to existing porch.

 

 

2013/00463/FUL

 

A

 

4, Cliffside, Penarth

 

Demolition of existing conservatory, extension and remodelling of existing house to create additional ground floor living space and first floor balcony.

 

 

2013/00483/FUL

 

A

 

111, St. Davids Crescent, Penarth

 

Two storey side extension.

 

 

2013/00493/FUL

 

A

 

2, Springfield Close, Wenvoe

 

Remove existing garage to side of property, add new extension with roof over.

 

 

2013/00559/PNA

 

A

 

Court Farm, St Mary Hill, Treoes

 

Replacement building.

 

 

2013/00137/FUL

 

A

 

Land to the east of Trerhyngyll

 

Stable and use of field for equestrian.

 

 

2013/00194/FUL

 

R

 

Millands Park, Llanmaes

 

Erection of a small agricultural shed for the storage of machinery, hay, fertilizers, sheep and general agricultural implements.

 

 

2013/00292/FUL

 

A

 

29, Clevedon Avenue, Sully

 

Demolition of existing garage, remodelling and extension of existing house, construction of new vehicle access and detached garage, and change of use of land from playing fields to garden.

 

 

2013/00429/FUL

 

A

 

17, Laburnum Way, Penarth

 

Two storey rear extension.

 

 

2013/00432/FUL

 

A

 

New Beaupre Farm, St. Athan Road, Cowbridge

 

Retrospective approval for agricultural building in existing farm yard (to be used as winter accommodation for stock).

 

 

2013/00437/FUL

 

A

 

34, Cosmeston Drive, Penarth

 

Front two storey extension.

 

 

2013/00444/FUL

 

A

 

10, Hollyrood Close, Barry

 

Proposed single storey rear extension (sun lounge and utility).

 

 

2013/00446/FUL

 

A

 

The Pippins, Drope Road, St. Georges Super Ely

 

Orangery to rear and extension to front elevation.

 

 

2013/00447/FUL

 

A

 

9, The Paddocks, Penarth

 

Ground floor - Extension to kitchen, utility room, family room. Conversion of existing garage to living accommodation and erection of new garage.

First floor - Erection of bedroom/ ensuite extension.

 

 

2013/00456/FUL

 

A

 

26, Birch Lane, Penarth

 

Proposed utility room and porch canopy.

 

 

2013/00462/FUL

 

A

 

8, Fforest Drive, Barry

 

Rear two storey extension.

 

 

2013/00465/FUL

 

A

 

22, Heol Sirhwi, Barry

 

Single storey extension and internal alterations.

 

 

2013/00467/FUL

 

A

 

92, Port Road East, Barry

 

Proposed ground floor extension to form family room and enlarge kitchen. Proposed roofspace conversion to form bedroom/ bathroom and replacement of hipped roof with gabled roof.

 

 

2013/00470/FUL

 

A

 

16, St. Lythans Road, Barry

 

Kitchen, garden room extension.

 

 

2013/00490/FUL

 

A

 

Church House, Church Terrace, St. Marys Church

 

Retrospective application for proposed minor renewal of existing roof.

 

 

2013/00495/FUL

 

A

 

29a Park Road, Barry

 

Change of Use from a hairdressing salon (A1) to a tattoo parlour (sui-generis).

 

 

2013/00516/FUL

 

A

 

57, Golwg y Coed, Barry

 

Erection of a single storey conservatory at rear of property.

 

 

2013/00521/FUL

 

A

 

47, Claude Road, Barry

 

Proposed double storey side extension and single storey front extension.

 

 

2013/00569/PNA

 

A

 

Darren Farm, Cowbridge

 

Proposed concrete storage area.

 

 

 

315     TREES (DDS) -

 

(i)         Delegated Powers -

 

RESOLVED - T H A T the following applications determined by the Director under delegated powers be noted:

 

Decision Codes

 

A    -    Approved

E         Split Decision

 

R    -    Refused

 

2013/00459/TCA

 

A

 

Plymouth House East, Dimlands Road, Llantwit Major

 

Remove three Ash trees.

 

2013/00474/TCA

 

A

 

Bluestones, Llancarfan

 

Strip and fell Hornbeam tree.

 

2013/00506/TCA

 

A

 

Raglan House, 20, Highwalls Road, Dinas Powys

 

Removal of Lawsons Cypress ('Intertexta' cultivar?).

 

2013/00532/TCA

 

A

 

The Farm, Llanbethery

 

Remove the mature Sycamore tree located in rear garden.

 

 

 

316     PLANNING APPLICATIONS (DDS) -

 

Having considered the applications for planning permission and where necessary the observations of interested parties,

 

RESOLVED - T H A T in pursuance of the powers delegated to the Committee, the following applications be determined as indicated and any other necessary action taken:

 

2012/00483/FUL      Received on 18 May 2012

(P.15)

Mr. John Buxton, Cambrian Transport (Cambrianco) Ltd., The Station Buildings, Station Approach, Barry Island, Vale of Glamorgan, CF62 5TH

Mr. John Buxton, Cambrian Transport (Cambrianco) Ltd., The Station Buildings, Station Approach, Barry Island, Vale of Glamorgan, CF62 5TH

 

The Railway Shed, Plymouth Road, Barry Island

 

Construction of a car park

 

APPROVED subject to the following condition(s):

 

1.         Within 3 months of the date of this planning permission, details of the proposed access arrangements for the site shall be submitted to and approved in writing by the Local Planning Authority.  The details shall include a Swept Path Analysis Plan to demonstrate how commercial, large vehicles will enter and exit the site, and a timing schedule for the implementation of any alterations that are necessary to the existing access.  The access shall be completed in accordance with the approved details, and in accordance with the agreed turning schedule and at all times thereafter be retained in accordance with the approved details.

 

Reason:

           

In the interests of highway safety and to ensure compliance with Policy ENV27 of the Unitary Development Plan.

 

2.         Prior to the first use of the car park full details of a scheme for surface water drainage shall be submitted to and approved in writing by the Local Planning Authority and the approved scheme shall be fully implemented in accordance with the approved details and thereafter so maintained at all times.

           

Reason:

           

To ensure the satisfactory drainage of the site and to ensure compliance with the terms of Policy ENV27 of the Unitary Development Plan.

 

3.         The car parking scheme shall be laid out in accordance with the approved details prior to its first beneficial use for parking, and shall thereafter be so retained at all times.

           

Reason:

           

In the interests of highway safety, and to ensure compliance with Policy ENV27 of the Unitary Development Plan.

 

4.         Prior to the beneficial use of the car park hereby approved, details of a Management Plan must be submitted to and approved in writing by the Local Planning Authority. The Management Plan shall include details of the operation of the car park, including hours of operation, traffic management and drainage. The operation of the car park shall be undertaken in accordance with the approved Plan unless otherwise agreed in writing with the Local Planning Authority. 

 

Reason:

 

To ensure that the operation of the development is undertaken in a neighbourly manner and in the interests of the protection of amenity and the environment and to ensure compliance with the terms of Policy ENV27 of the Unitary Development Plan.

 

5.         Prior to the first beneficial use of the car park hereby approved, a scheme detailing the retention (and maintenance) of the railings around the perimeter of the site and retention of planting within the site shall be submitted to and approved in writing by the Local Planning Authority.  The railing and planting within the site shall thereafter be retained/maintained at all times thereafter in full accordance with the agreed scheme.

 

Reason:

 

In the interests of visual amenity and to ensure compliance with the terms of Policy ENV 27 of the Unitary Development Plan.

 

 

2013/00540/FUL      Received on 12 June 2013

(P.23)

Mr. John Buxton, Cambrian Transport (Cambrianco) Ltd., The Station Buildings, Station Approach, Barry Island, Vale of Glamorgan, CF62 5TH

Mr. John Buxton, Cambrian Transport (Cambrianco) Ltd., The Station Buildings, Station Approach, Barry Island, Vale of Glamorgan, CF62 5TH

 

The Railway Shed, Plymouth Road, Barry Island

 

Temporary use of Plymouth Road Railway Shed site for the storage of materials in association with Network Rail Signal Renewal Contractor for a period up to 18 months

 

APPROVED subject to the following condition(s):

 

1.         This consent shall be for a temporary period only and the use shall cease on site on or before 25 January 2015.

             

Reason:

           

To enable the Local Planning Authority to control the nature of the use within the application site and to comply with Policy ENV27 of the Unitary Development Plan.

           

 

2.         The use of the building shall be for the storage of materials required in association with Network Rail's Signal Renewal Contract only.

 

Reason:

           

In order to control the nature of the proposed use and to comply with Policy ENV27 of the Unitary Development Plan.

 

3.         No materials whatsoever shall be deposited or stored within the limits of the adopted highway.

           

Reason:

           

In the interest of highway / public safety and the free flow of traffic along the adopted highway.

           

 

2012/00823/FUL      Received on 11 April 2013

(P.29)

Mr. Mark Lane, Castle Lodge, St. Georges Super Ely, Vale of Glamorgan, CF5 6EW

Mr. Mark Lane, Castle Lodge, St. Georges Super Ely, Vale of Glamorgan, CF5 6EW

 

Castle Lodge, St. Georges Super Ely

 

Proposed resubmission of previously approved 11/00489/FUL of a 4 bed detached dwelling with detached double garage to side due to minor amendments to the elevations and materials used

 

DEFERRED              Site Visit

 

 

2013/00236/OUT     Received on 14 March 2013

(P.41)

Mr. I. and Mrs. E. Ashman, 40, Park Court Road, Bridgend, Mid Glamorgan, CF31 4BW

Mr. Steven Willis, 5, Bluebell Wood, Billericay, Essex, CM12 0ES

 

Land to the west of Craig Yr Eos Avenue, Ogmore By Sea

 

Development of six dwellings with memorial garden

 

RESOLVED - T H A T subject to the interested person(s) first entering into a Section 106 Legal Agreement to include the following necessary planning obligations:

 

·               Public open space will be provided on site at a ratio of at least 55.4sqm per dwelling, which shall be provided in accordance with a fully detailed scheme to be approved by the Local Planning Authority.

 

·               The developer shall make appropriate provision for the future maintenance of the public open space or if the developer and Local Authority agree, may transfer the public open space to the Council free of charge and pay an appropriate contribution as a commuted sum to cover the costs of future maintenance of the public open space for 20 years.

 

·                To commission a full and comprehensive Condition Survey (First Condition Survey) of the highway infrastructure of Craig yr Eos Avenue and Craig yr Eos Road, which shall be undertaken be a suitably qualified and experienced independent Highway Maintenance Consultant to be approved by the Local Highway Authority, prior to commencement of development.

 

·                A Second Condition Survey shall be undertaken within 28 days following the substantial completion of the development and where deemed necessary, the developer shall carry out any remedial works to the existing Highway network identified as a direct result of the development works and construction traffic.

 

·                To provide a bond to secure the proper implementation of the highway works inclusive of any off site highway improvements.

 

·               The payment of a fee to monitor and implement the Legal Agreement based on 20% of the application fee or 2% of the total financial contributions (being sought, whichever is the greater).

 

APPROVED subject to the following conditions(s):

 

1.         This consent shall relate to the plans registered on 14 March 2013 other than where amended by the site location plan reference Rev B Planning - July 12 received on 10 July 2013.

           

Reason:

           

To ensure a satisfactory form of development and for the avoidance of doubt as to the approved plans.

 

2.         Approval of the details of the layout, scale, appearance, access and landscaping of the development (hereinafter called the reserved matters) shall be submitted to and approved by the Local Planning Authority before any development is commenced.

           

Reason:

           

To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

3.         Application for approval of the reserved matters hereinbefore referred to must be made not later than the expiration of three years beginning with the date of this permission.

 

Reason:

           

To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

4.         The development to which this permission relates must be begun not later than whichever is the later of the following dates:

           

(a)        The expiration of five years from the date of this permission.

           

(b)       The expiration of two years from the date of the final approval of the reserved matters or, in the case of approval on different dates the final approval of the last such matters to be approved.

           

Reason:

           

To comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

5.         Plans and particulars of the reserved matters referred to in Condition No. 1 above shall be submitted in writing to the Local Planning Authority and shall be carried out as approved.

           

Reason:

           

The application was made for outline planning permission and to comply with the requirements of Section 92 of the Town and Country Planning Act 1990.

 

6.         Each new dwelling hereby permitted shall be constructed to achieve a minimum Code for Sustainable Homes Level 3 and achieve a minimum of 1 credit under category 'Ene1 - Dwelling Emission Rate' in accordance with the requirements of Code for Sustainable Homes: Technical Guide November 2010. The development shall be carried out entirely in accordance with the approved assessment and certification.

           

Reason:

           

To ensure the development attains the sustainable building standards required by Planning Policy Wales and TAN22 - Planning for Sustainable Buildings.

 

7.         Construction of any dwelling hereby permitted shall not begin until an 'Interim Certificate' has been submitted to the Local Planning Authority, certifying that a minimum Code for Sustainable Homes Level 3 and a minimum of 1 credit under 'Ene1 - Dwelling Emission Rate', has been achieved for that individual dwelling or house type in accordance with the requirements of the Code for Sustainable Homes: Technical Guide November 2010.

 

Reason:

           

To ensure the development attains the sustainable building standards required by Planning Policy Wales and TAN22 - Planning for Sustainable Buildings.

 

8.         Prior to the occupation of the individual dwelling hereby permitted, a Code for Sustainable Homes 'Final Certificate' shall be submitted to the Local Planning Authority certifying that a minimum Code for Sustainable Homes Level 3 and a minimum of 1 credit under 'Ene1 - Dwelling Emission Rate', has been achieved for that dwelling in accordance with the requirements of the Code for Sustainable Homes: Technical Guide November 2010.

           

Reason:

           

To ensure the completed development attains the sustainable building standards required by Planning Policy Wales and TAN22 - Planning for Sustainable Buildings.

 

9.         The proposed development site is crossed by a public sewer and water main.  No development will be permitted within 3 metres either side of the centreline of the pipe.  The application(s) for the approval of the reserved matters shall ensure that no dwellings are located within  the safety zone and the line of the sewer shall be clearly shown in the submitted application(s) for approval of reserved matters.

           

Reason:

           

To protect the integrity of the public sewer and avoid damage thereto and to comply with the terms of Policy ENV27 of the Unitary Development Plan.

 

10.      The subsequent reserved matters application(s) shall ensure that the dwellings do not exceed a ridge height of 6 metres and eaves height of 2.2 metres (above DPC) when viewed from Craig yr Eos Avenue.

           

Reason:

           

In order to ensure that the dwellings are consistent in terms of the their overall height, in the interest of visual amenities of Craig yr Eos Avenue in accordance with Policies ENV27 and HOUS8 of the Unitary Development Plan.

 

11.      The subsequent reserved matters application(s) shall ensure that the dwellings are set back 6 metres from the back of the footway.

           

Reason:

           

In order to ensure that the dwellings are consistent in terms of their building line and to provide adequate provision for off street parking, in the interest of visual amenities and highway safety in accordance with Policies ENV27, HOUS8 and TRAN10 of the Unitary Development Plan.

 

12.      Prior to the submission of any reserved matters application(s) a detailed schedule and samples of materials and finishes shall be submitted to and approved by the Local Planning Authority. The reserved matters application(s) shall thereafter be submitted in line with the agreed schedule of materials and finishes.

           

Reason:

           

To ensure a consistent approach to the materials and finishes of the dwellings in the interests of visual amenities and to ensure compliance with Policy ENV27.

 

13.      Prior to the submission of any reserved matters application(s) a detailed construction drawing and design calculations, duly certified by a professional engineer and full engineering details of all structures (drainage systems, water culverts etc. abutting or within close proximity to the existing / proposed highway) shall be submitted to and approved by the Local Planning Authority having full regard to the following :

           

  • an illuminated footway of a minimum width of 1.8m fronting the entire length of the site (Craig-yr-Eos Avenue and Craig-yr-Eos Road) inclusive of all statutory / highway services, dropped vehicular accesses / pedestrian crossings facilities etc, any diversion of existing highway / statutory undertakers equipment and the provision of a dropped crossing facility inclusive of tactile pacing across the existing road junction (Craig-yr-Eos Avenue and Craig-yr-Eos Road).
  • a section of land identified as forming part of the memorial garden to improve the existing road junction (Craig-yr-Eos Avenue / Craig-yr-Eos Road ) to provide and maintain thereafter minimum vision splays of 25m x 2.4min in a westerly  direction along Craig-yr-Eos Road (to be clearly identified by a demarcation strip or change of material) to be dedicated for highway / public purposes.
  • improvements to the vehicular turning facility located at the end of Craig-yr-Eos Avenue to provide a minimum clear turning area of 10m x 10m and be dedicated to the Highway Authority.

Reason:

           

To ensure the minimum Design and Construction Standards are achieved in the interests of Highway / Public Safety and to ensure compliance with Policy ENV27.

 

14.      The illuminated footways as approved under Condition 9 shall be constructed in accordance with the Vale of Glamorgan Council's specifications for adoption and shall be fully completed to the satisfaction of the Local Planning / Highway Authority prior to beneficial occupation of the last dwelling or within three years of the commencement of any works on site (which ever is the sooner). Any land within the ownership of the applicant which is required to construct the new lengths of footways which currently does not form part of the adopted highway shall be dedicated to the Highway Authority as part of the adopted highway.

           

Reason:

           

In order to ensure that the footways are constructed and thereafter maintained as adopted highway in the interests of pedestrian safety in accordance with Policy ENV27 of the Unitary Development Plan.

 

15.      The submitted reserved matters application(s) shall ensure that all dwellings incorporate and maintain thereafter a minimum vision splay of (site frontage ) x 2m in both directions along Craig-yr-Eos Avenue together with a 2m x 2m vision splay on either side of the proposed vehicular accesses.

           

Reason:

           

In the interest of Highway / Public Safety and to accord with Policy ENV27 of the Unitary Development Plan.

 

16.      Unless otherwise agreed with the Local Planning Authority the submitted reserved matters application(s) shall ensure that the gradient of any proposed vehicular access / driveways serving the individual plots shall not exceed 5 % ( 1:20 for the first 6m and thereafter shall not be steeper than 12.5% (1 in 8).

           

Reason:

           

To ensure design standards are achieved in the interests of highway and public safety and to ensure compliance with Policy ENV27 of the Unitary Development Plan.

 

17.      Full details of a scheme for drainage of the development shall be submitted to and approved in writing by the Local Planning Authority and the approved scheme shall be fully implemented in accordance with the approved details.

           

Reason:

           

To ensure a suitable drainage scheme, and to ensure compliance with the terms of Policy ENV27 of the Unitary Development Plan.

 

18.      The implemented drainage scheme for the site shall ensure that all  foul and surface water discharges separately from the site and that land and surface water drainage run-off does not discharge, either directly or indirectly, into the public sewerage system.

           

Reason:

           

To prevent hydraulic overloading of the public sewerage system, pollution of the environment and to protect the health and safety of existing residents and ensure no detriment to the environment and to comply with the terms of Policies ENV27 and ENV29 of the Unitary Development Plan.

 

19.      Any further clearance of the site shall not take place between 1 March and 31 August, unless it can be demonstrated that nesting birds are absent in a report prepared by a qualified ecologist (immediately prior to development commencing)  or a method statement for works is submitted to and approved in writing by the Local Planning Authority and where a method statement is agreed that it is fully implemented.

           

Reason:

           

To comply with Unitary Development Plan Policy ENV16 to secure the long-term protection of the species and to demonstrate Local Authority compliance with S40 of the NERC Act 2006.

 

20.      Prior to the submission of any reserved matters application(s) a Reptile Site Clearance Method Statement shall be submitted to approved in writing by the Local Planning Authority in reference to  each individual plot and shall take into account varying start times of the development plots and declining habitat availability with the subsequent development of each plot.

           

Reason:

           

To comply with Unitary Development Plan Policy ENV16 and to demonstrate Local Authority compliance with S40 of the NERC Act 2006.

 

21.      The submitted reserved matters application(s) shall have required to the requirements of the Amenity Standards SPG in relation to the placement of windows of habitable rooms in any dwelling.

 

Reason:

           

To protect the amenities of neighbours, in accordance with Policy ENV27 and HOUS8 of the Unitary Development Plan.

 

22.      Prior to the submission of any reserved matters application(s) a detailed scheme setting out the means of enclosure between plots, along the frontage of the site (including the area of POS) shall be submitted to and approved by the Local Planning Authority. The reserved matters application(s) shall thereafter be submitted in line with the agreed means of enclosures.

           

Reason:

           

To ensure a consistent approach to enclosures in the interests of visual amenities and to ensure compliance with Policy ENV27 of the Unitary Development Plan.

 

23.      The submitted reserved matters application(s) shall be supported by detailed sections across and through each plot(s), setting out the existing and finished levels of the plot(s) (including slab levels), in relation to the adjoining land and carriageway level, which shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in full accordance with the approved details.

           

Reason:

           

In the interests of visual amenity, in order to protect the amenities of neighbouring properties and to ensure the development accords with Policies ENV27 and HOUS8 of the Unitary Development Plan.

 

24.      The submitted reserved matters application(s) shall be supported by a method statement for each plot(s) detailing the construction phase, including details of material and storage compounds, wheel wash facilities (within the site) and hours of construction, which shall be submitted to and approved in writing by the Local Planning Authority.

 

Reason:

 

In the interests of highway safety and the amenities of nearby residential occupiers and to ensure compliance with the terms of Policy ENV27 of the Unitary Development Plan.

 

 

2013/00359/FUL      Received on 24 April 2013

(P.64)

Mr. Robert Powell, 17, Lee Sor Hill, Peterston Super Ely, Vale of Glamorgan, CF5 6LH

Mr. Robert Powell, 17, Lee Sor Hill, Peterston Super Ely, Vale of Glamorgan, CF5 6LH

 

Former Auction Yard, Station Terrace, Peterston Super Ely

 

Change of use of part of office/store building to provide living accommodation and associated external alterations to building

 

As such, the proposed residential use of the existing storage building is considered contrary to Policies ENV1 - Development in the Countryside; ENV3 - Green Wedges, ENV4 - Special Landscape Areas; and ENV8 - Small Scale Rural Conversions of the adopted Vale of Glamorgan Unitary Development Plan 1996-2011, and would not be in full accordance with the provisions of Technical Advice Note 12 (Planning for Sustainable Rural Communities) and Planning Policy Wales (Edition 5).  

 

REFUSED     (written representations)

 

1.         The proposal would represent the unacceptable change of use of part of a recently constructed building to a residential dwelling in the countryside in an unsustainable location, where there is no sufficient overriding justification or material considerations to outweigh the policy presumption against such development. As such, the proposed residential use of the existing storage building is considered contrary to Policies ENV1 - Development in the Countryside; ENV3 - Green Wedges; ENV4 - Special Landscape Areas; and ENV8 - Small Scale Rural Conversions of the adopted Vale of Glamorgan Unitary Development Plan 1996-2011, and would not be in accordance with the provisions of Technical Advice Note 12 (Planning for Sustainable Rural Communities) and Planning Policy Wales (Edition 5).  

 

 

2013/00471/FUL      Received on 30 May 2013

(P.74)

Mr. Ken Shapley, Millbrook Heights, Dinas Powys, Vale of Glamorgan, CF64 4JJ

GHA, The Studio, 117, West Park Drive, Nottage, Porthcawl, Bridgend, CF36 3RN

 

Cosmeston Cottages, Lavernock Road, Penarth

 

New detached three bedroom dwelling

 

Application WITHDRAWN by the Applicant.

 

 