CABINET
MINUTES of a meeting held on 2nd
April, 2008.
Present: Councillor Ms. M.E.
Alexander (Chairman); Councillor N. Moore (Vice-Chairman);
Councillors R.F. Curtis, S.C. Egan, N.J. Gibbs, Mrs. V.M. Hartrey,
G. John, Mrs. M.R. Wilkinson and C.J. Williams.
C3454
APOLOGIES FOR ABSENCE -
These were received from Councillor Mrs. M.
Randall.
C3455
MINUTES -
RESOLVED - T H A T the minutes of the meeting
held on 12th March, 2008 be approved as a correct
record.
C3456
DECLARATIONS OF INTEREST -
Councillor N.J. Gibbs declared an interest in
Agenda Item No. 12 in that he was a Member of Penarth Town
Council.
Councillor S.C. Egan declared an interest in
Agenda Item No. 8(a) in that he was a Member of the YMCA Board.
C3457
WALES COUNCIL FOR VOLUNTARY ACTION: 2008 LOCAL GOVERNMENT ELECTIONS
MANIFESTO (REF) –
The Wales Council for Voluntary Action (WCVA)
represented a large proportion of the voluntary or third sector in
Wales. WCVA had produced a manifesto for the 2008 local
elections on behalf of the voluntary sector. The Vale of
Glamorgan Council had managed to meet several of the goals outlined
in the manifesto but it was suggested by voluntary sector
representatives that the Council might wish to consider support for
the adoption of all aspects of the document.
The Voluntary Sector Joint Liaison Committee
had
AGREED -
(1) T H A
T the Wales Council for Voluntary Action manifesto be noted and
circulated to all Members of the Council for information.
(2) T H A
T the Wales Council for Voluntary Action manifesto be referred to
Cabinet for consideration.”
Cabinet, having considered the recommendations
of the Voluntary Sector Joint Liaison Committee
RESOLVED – T H A T the decisions of the
Voluntary Sector Joint Liaison Committee be noted, and be
reconsidered following the Local Government elections in May
2008.
C3458
CCTV IN THE VALE OF GLAMORGAN – REPORT OF THE TASK AND FINISH GROUP
OF THE SCRUTINY COMMITTEE (COMMUNITY WELLBEING AND SAFETY) (REF)
–
The Scrutiny Committee (Community Wellbeing
and Safety) had appointed a Task and Finish Group to examine CCTV
systems in the Vale of Glamorgan. The report of the Task and
Finish Group detailed the Members that had taken part in the
review, the information that had been received in order to reach
its conclusions and the meetings and visits that had been made in
consideration of the topic.
Scrutiny Committee were also advised that the
Task and Finish Group had considered that CCTV in the Vale
could have considerable budget implications and that further work
would need to be undertaken that the Group had considered was not
within their remit. However, the Group had made 12
recommendations and Members present at the meeting highlighted to
the Scrutiny Committee that one of its main concerns had been in
relation to the fact there was no overall responsibility for advice
and guidance that existed within the Vale in relation to the
purchase of equipment for CCTV on Council premises or for the
siting of such equipment. To this end one of the recommendations
that the Group had considered was particularly important was that a
Lead Officer should be designated to take overall responsibility
for advice and guidance, in particular on the purchase of equipment
for CCTV on Council premises, including schools throughout the Vale
and prior to any decision being made on the purchase or siting of
such equipment.
Having considered the report and the comments
from some of the Members who had taken part in the review, Scrutiny
Committee had
RECOMMENDED -
(1) T H A
T the 12 recommendations as detailed below together with the
report, be forwarded to Cabinet for consideration:
R1 T H A T consideration
be given to include the provision of CCTV in new developments
where appropriate through planning conditions or Section 106
agreements.
R2 T H A T
the Council continues at every opportunity to publicise the
presence and use of CCTV and its successes to assist the Police to
deal with crime and disorder in the Vale of Glamorgan.
R3 T H A T
a lead officer be designated to take overall responsibility for
advice and guidance, in particular on the purchase of equipment for
CCTV on Council premises, including schools, throughout the Vale,
and prior to any decision being made on the purchase and siting of
such equipment.
R4 T H A T the CCTV
co-ordinator contacts all departments / schools to offer advice and
guidance when considering the installation or upgrading of CCTV
equipment.
R5 T H A T any project being
undertaken within the Vale of Glamorgan Council be required to
consider CCTV requirements within its briefs.
R6 T H A T
an annual report be submitted to the Safer Vale Partnership, the
Council’s Cabinet and the Scrutiny Committee (Community Wellbeing
and Safety) in relation to the use of all new and existing CCTV
installations throughout the Vale.
R7 T H A T
the Lead Officer be responsible for ensuring that effective
communications exist between schools and Council premises in the
Vale that are not linked to or monitored by the Control Room.
R8 T H A T
the data protection principles and the Code of Practice issued by
the ICO (Information Commissioner’s Office) be fully considered and
adhered to when installing CCTV on Council premises.
R9 T H A T
the Safer Vale Partnership and Cabinet continue to consider the use
and location of new CCTV technology throughout the Vale.
R10 T H A T the
Council continues to develop close working relationships with the
Police to ensure strategic monitoring to enable them to use CCTV to
greatest effect in combating crime and promoting community
safety.
R11 T H A T the Safer
Vale Partnership be asked to develop links with the Transport
Police in relation to Security on railway stations.
R12 T H A T the Vale
Auditor’s report be presented to Cabinet for consideration at the
earliest opportunity.
(2) T H A
T the Scrutiny Committee takes this opportunity to thank the
Members of the Task and Finish Group for the work undertaken in
relation to CCTV within the Vale of Glamorgan.
Cabinet, having considered the recommendations
of the Scrutiny Committee (Community Wellbeing and Safety)
RESOLVED -
(1) T H A
T appreciation of the efforts of the Scrutiny Committee (Community
Wellbeing and Safety) and the Task and Finish Group be placed on
record.
(2) T H A
T a further report on the implementation of the recommendations be
brought before a future meeting of the Cabinet.
Reasons for decisions
(1) To
record the appreciation of the Cabinet.
(2) To
consider the implementation of the recommendations.
C3459
CONTRACT FOR SERVICES: SOUTH EAST WALES BIOLOGICAL RECORDS CENTRE
LIMITED (DEER) (SCRUTINY – ECONOMY AND ENVIRONMENT) –
Cabinet received a report on progress of the
biodiversity initiative regarding the South East Wales Biological
Records Centre Limited (Sewbrec), and considered a request for
approval for a Contract for Services.
The importance of access to up to date
biological data and the need for a commitment and contribution to
local record centres had been highlighted by the Welsh Assembly as
part of guidance on the Natural Environment and Rural Communities
Act 2006 (DEFRA 2007 guidance for local authorities on implementing
the biodiversity duty).
Further guidance from the Welsh Assembly,
Countryside Council for Wales and the Wales Biodiversity
Partnership highlighted the importance of investing in an Agreement
with a Local Records Centre, citing it as best practice in the
fulfilment of the Assembly Government’s Environment Strategy for
Wales (Biodiversity checklist for local authorities, available from
the Wales Biodiversity Partnership).
Services provided by Sewbrec included species
and habitat audits, digitisation of data and biodiversity
information searches relating to Council owned or managed land,
development control and the Local Development Plan.
These services would enable a more complete
and efficient delivery of aspects of the authorities statutory
obligations as well as providing essential data for the Vale’s
local biodiversity action plan.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T a Contract for Services with the South East Wales Biological
Records Centre Limited to provide ecological services be approved
upon such terms and conditions as deemed appropriate by the
Director of Legal, Public Protection and Housing Services.
(2) T H A
T a further report be brought before a future Cabinet regarding the
funding of Resolution (1) above and for future years.
Reasons for decisions
(1&2) Sewbrec is able to provide
essential ecological data to enable compliance with both
legislation and guidance from the Welsh Assembly, Countryside
Council for Wales and the Wales Biodiversity Partnership.
C3460
CROWD CONTROL BARRIERS – CWRT Y VIL PLAYING FIELDS (DEER) (SCRUTINY
– ECONOMY AND ENVIRONMENT) –
Approval was sought to progress the
installation of crowd control barriers around the senior pitch at
Cwrt y Vil Playing Fields in response to a request for the
improvement of facilities at the football pitch, to permit the
progression of Penarth Town Football Club to the South Wales Senior
League.
The request from Penarth Town Football Club
involved the installation of crowd control barriers which would be
900mm high and be positioned 2 metres away from the pitch
touchline. The barrier was to be manufactured using 1 ½ inch
galvanised steel tubing finished in white and jointed using key
clamp fixings. The support posts would be fixed underneath
the ground with concrete.
The barrier would be installed by the Club
with no construction costs to the Council and it would be a
requirement that the structure be covered by the Club’s own
liability insurance.
In addition, the Club would also be
responsible for any maintenance. The barrier would be
installed under the control of the Council which, in addition to
monitoring the quality of work undertaken, would also ensure that
all access requirements were maintained. Furthermore, in
order to preserve the greatest area of recreational land available
for use in the summer, the barrier would be removed by the Club at
the end of the football season.
The Club had also asked that the current pitch
be moved, effectively siting the pitch closer to St. Martin’s
Close. Members were aware that there had been a longstanding
issue with residents of St. Martin’s Close as regards access to the
playing fields from St. Martin’s Close and resultant anti-social
behaviour. There had also been anti-social behaviour
experienced by footballers and spectators when, at a previous time,
the pitch had been located closer to St. Martin’s Close. It
was proposed that no movement of the pitch be granted at this time
until full agreement could be obtained from nearby residents.
As this would not be possible in the short term it was proposed
that the crowd control barriers be installed around the senior
pitch at its current location.
In recognition of the longstanding issue
concerning access to the fields through St. Martin’s Close, Penarth
Town Football Club had offered to install an additional fence at
the boundary of St. Martin’s Close and the playing fields, to
effectively prevent access to the fields from St. Martin’s
Close. It was felt that, whilst this offer was commendable,
the Council was not currently in a position to agree the permanent
denying of access to the fields from St. Martin’s Close. It
was therefore not proposed to accept this offer of fencing from the
football club at this time.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T should Penarth Town Football Club obtain promotion to the Senior
or Amateur League for 2008/09, the club be authorised to erect a
barrier around the senior pitch at the Cwrt y Vil Playing Fields
marked (b) on the plan attached to the report, to a standard and
design to be agreed by the Director of Environmental and Economic
Regeneration on the basis that no objections had been received from
local members.
(2) T H A
T the barrier be removed by the Club at the end of the football
season and re-installed again prior to the start of the football
season.
Reasons for decisions
(1) To
enable the Club to meet the requirements of higher league
football.
(2) To
encourage greater use of the playing field in the summer.
C3461
COWBRIDGE LEISURE CENTRE – ACCESS (DFICTP) (SCRUTINY – CORPORATE
RESOURCES AND ECONOMY AND ENVIRONMENT) –
Authority was sought to grant a right of
access across the land at the leisure centre from the Broadshord to
the adjoining Bearfield to serve the proposed new heath facility to
be constructed there.
The access road from the Broadshord currently
serving Cowbridge Leisure Centre as well as other uses adjacent to
it was a private road and was not to adoptable standards. The
access configuration from the Broadshord was also
substandard.
The request for access had raised serious
concerns as to whether it could be technically and safely
achieved. Following detailed discussions within and without
the planning process, a design solution had been developed which
satisfied the highway criteria and which afforded improved
pedestrian and vehicular access. The existing road would be
slightly realigned and the new/existing upgraded to adoptable
standards. The realignment would also necessitate the
reconfiguration of the existing car parking to mitigate the loss of
any parking spaces. The works would require a drain to be
laid under the car park to an adjoining watercourse. All the
works would be carried out at no cost to the Council.
The District Valuer had negotiated the
consideration due to the Council for the privilege to be granted
and had certified that it was proper and in accord with the
Council’s legal obligations.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T the right of access and associated drainage easement be
granted.
(2) T H A
T the Director of Finance, ICT and Property be authorised to agree
and settle the terms and conditions of the grant and to accept the
negotiated fee therefore.
(3) T H A
T the Director of Legal, Public Protection and Housing Services be
authorised to prepare, complete and execute any necessary legal
documentation required.
Reasons for decisions
(1) To
facilitate the provision of the new health facility for Cowbridge
and to gain an improved access to the leisure centre.
(2) To
enable the transaction to proceed.
(3) To
effect the completion of the grant.
C3462
BARRY YMCA – LOAN (DFICTP) (SCRUTINY – CORPORATE RESOURCES)
–
(Councillor S.C. Egan withdrew from the
meeting whilst this matter was considered)
Cabinet considered an application from the
Barry YMCA for a variation in the terms of the loan which they had
received from the Council and for the associated legal charge on
their premises to be demoted or discharged.
The YMCA had provided projected accounts that
indicated its finances over the next three years were expected to
be insufficient to provide for re-payment of the Council’s loan on
its existing basis, and had requested that the Council reconsider
the terms.
A request had been received from the YMCA for
the Council to agree to its charge on the property being amended,
so that it would have equal ranking with the other three existing
charges i.e. WAG, the National Council of the YMCA of Wales and the
Big Lottery Fund. This was a condition of Big Lottery
Funding, and solicitors for the YMCA had advised that WAG and the
National Council for the YMCA had agreed to their existing charges
being amended to have equal ranking.
With regard to registering further charges or
varying existing charges there was a restriction on the title
register, entered when WAG altered their priority position with the
National YMCA, that no additions or alterations deemed prejudicial
to the other charge holders may be made without their consent.
The YMCA was seeking to identify new sources
of income, however, there was no evidence that its finances in the
foreseeable future were likely to sufficiently improve to allow for
repayment of the loan on the original terms. Further, the
continued burden of loan repayments could have a serious
detrimental impact on the further development of a much valued
community facility.
Whilst repayment of the loan could be further
deferred, in light of the anticipated financial position of the
organisation and the desire of the Council for the facility to be
retained and improved, it was proposed that the loan be converted
to a grant.
The effect of this proposal would be to remove
the Council’s legal charge in its entirety. Whilst the
Council could consider raising a charge for the grant, this would
require permission of the other chargees which may not be
forthcoming.
This was a matter for Executive decision.
RESOLVED – T H A T consideration of the report
be deferred for a further report outlining all the alternatives
available to resolve this issue, including an extension to the
original loan period or waiving the grant or any combination of a
resolution available. The report should also include all the
costs and legal implications to both the Council and the YMCA,
where possible.
Reason for decision
To consider further options..
C3463
CRIMINAL RECORDS BUREAU DISCLOSURES POLICY (DLD) (SCRUTINY –
CORPORATE RESOURCES) –
Endorsement was sought for the implementation
of a Criminal Records Bureau Disclosures Policy.
As an organisation using the CRB disclosure
service for assessing the suitability of applications for positions
of trust, the introduction of a policy would need to comply fully
with the CRB Code of Practice. The policy had been divided
into separate sections as follows:
Main Policy Statement –
·
Criminal Records Bureau Disclosures (information from CRB)
·
Policy Statement on the Secure Storage, Handling, Use, Retention
and Disposal of Disclosures and Disclosure Information
·
Policy Statement on the Recruitment of Ex-offenders
·
CRB Disclosure Outcomes (this was specific to Social Services but
to be adapted to each Directorate/Department)
·
CRB Disclosure Outcomes specific to taxi licensing applicants.
There were currently two levels of CRB checks
being processed within the Council, namely Standard and Enhanced
disclosures. Standard disclosures applied to individuals who
did not directly work with vulnerable people but who may work in an
environment where there could be access to vulnerable people.
Enhanced disclosures applied to individuals who had access to
vulnerable people or access to related sensitive administrative
documentation in respect of vulnerable people.
Although the majority of CRB disclosures were
undertaken in relation to check eligibility for employment within
the Council, a number of disclosures were also administered for a
number of reasons (e.g. taxi licence, foster carers, consultants,
contractors/agency workers acting on behalf of the Council).
In accordance with CRB advice, portability of
CRB disclosures from Outside Agencies would not be accepted by the
Council. Disclosures from other ‘Services’ (transferred
within the Council) would only be accepted if the original
Disclosure received the correct level of check for the new post and
that if an individual was to work with the same vulnerable
people. This did not apply to taxi licensing applications or
to those disclosures undertaken within Children and Adult Services,
Social Services, where internal portability was not accepted as
prescribed by the Care Council.
It was currently proposed that there would be
a period of three years before renewal of a Disclosure for those
Non Teaching staff employed within schools and within Social
Services. Taxi drivers may be required to receive annual
renewals at the discretion of the Licensing Committee, likewise
foster carers may require more regular CRB reviews.
Registered teachers remained subject to provision of the General
Teaching Council for Wales Scrutiny arrangements which in essence
provided for any serious criminal allegation/conviction to be
reported to them and onward to the employer. These
arrangements would continue pending implementation of the
forthcoming independent Safeguarding Authority consultations and
implementation arrangements which were expected to come into force
this October, at which point a further report would be referred to
the Cabinet.
As an ‘Umbrella Organisation’, the Council
acted on behalf of external organisations to undertake CRB checks
on their employees/volunteers on condition that the external
organisation provides a service for the Council on behalf of public
residing in the area of the Vale of Glamorgan. These
arrangements are subject to the outside organisation adhering to
the conditions set by the Council.
The central administration of the CRB process
was covered by the Human Resources Division, with the Operational
Manager Human Resources currently being the Council’s Lead
Signatory.
This was a matter for Executive decision.
It was noted that the word “Recruitment” in
Paragraph 4.4 of Appendix C should read “Rehabilitation”.
RESOLVED –
(1) T H A
T the implementation of the new CRB policy within the Council as
soon as practicable be endorsed.
(2) T H A
T a further report be submitted to Cabinet in respect of the
potential impact of the Council’s CRB Policy and Procedures on
implementation and supporting arrangements in respect of the
Independent Safeguarding Authority as proposed by the
Government.
Reasons for decisions
(1) To
meet the Council’s obligation to ensure a safe environment for
vulnerable people.
(2) To
provide progress reports on Government proposals, likely impact,
and an assessment on the existing CRB arrangements along with any
appropriate recommendations to support the introduction of the
Independent Safeguarding Authority requirements within the
Council.
C3464
CHANGE OF USE (DLD) (SCRUTINY – LIFELONG LEARNING) –
Cabinet received a report which
·
sought approval to submit a planning application for change of use
for the annexes at Cowbridge Community College, Old Hall, Cowbridge
from residential to business use
·
sought authority to enter into any agreement(s)/lease(s) required
subsequent to grant of planning consent for change of use.
The annexes at Cowbridge Community College,
Old Hall, Cowbridge had previously been let for residential
purposes. Over the years they had been used for educational
and community purposes as they became vacant. The approval
for change of use on these annexes had already been granted by the
former South Glamorgan County Council.
There were currently four annexes, units 3, 4,
5 and 6 which were vacant and required approval for change of
use.
Should the annexes be let for residential use,
the ‘right to buy’ legislation would apply after a period of
time.
The Creative Rural Communities Partnership had
proposed a regeneration initiative that could be delivered from the
annexes, but a funding application would depend on the appropriate
terms of a lease. Therefore, Cabinet approval was required to
submit a planning application seeking change of use.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T the submission of a planning application seeking change of use
from residential to business use for the vacant annexes 3, 4, 5 and
6 at Cowbridge Community College be approved.
(2) T H A
T Members approve entry into any subsequent lease agreements.
Reasons for decisions
(1) To
submit the planning application in accordance with Council
regulations.
(2) To
enter subsequent lease agreements in accordance with Council
regulations.
C3465
SURPLUS ASSET: COWBRIDGE SCHOOL CARETAKER’S HOUSE (DLD) (SCRUTINY –
LIFELONG LEARNING) –
Cabinet were requested to declare the
Caretaker’s house nearby to the Cowbridge School Lower Site surplus
and authority was sought for its disposal.
In light of the planned redevelopment of the
school at the Aberthin Road site, the school would no longer
require a residential caretaker located near the Town Mill Road
site, and the house was therefore surplus to operational
requirements.
The sale of the house would generate a capital
receipt that the Council could consider using to make a
contribution to redevelopment of Cowbridge School at Aberthin
Road.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T the Caretaker’s house be declared surplus and approval be granted
for its disposal.
(2) T H A
T the Director of Finance, ICT and Property be authorised to accept
the best offer received for the premises.
(3) T H A
T the Director of Legal, Public Protection and Housing Services be
authorised to prepare, complete and execute any necessary legal
documentation required.
Reasons for decisions
(1) To
enable marketing of that house to generate a capital receipt.
(2) To
comply with financial regulations.
(3) To
effect the completion of the disposal.
C3466
PROGRESS ON THE NEW YOUTH FACILITY IN PENARTH (DLD) (SCRUTINY –
LIFELONG LEARNING) –
Approval was sought to complete a lease
agreement with Penarth Town Council for the use of the former
Citizens Advice Bureau premises as a new youth facility.
The Director of Finance, ICT and Property had
negotiated suitable heads of terms with Penarth Town Council for
the lease of the premises which could be funded within existing
budgets of the Council’s Youth Service.
The Director of Legal, Public Protection and
Housing Services required Cabinet approval to complete the
negotiations to establish a lease agreement.
This was a matter for Executive decision.
RESOLVED – T H A T the Director of Legal,
Public Protection and Housing Services be authorised to complete
the lease.
Reason for decision
In order to complete the transaction.
C3467
MAKING THE CONNECTIONS – ILLEGAL MONEY LENDING PROJECT –
AUTHORISATION OF OFFICERS (DLPPHS) (SCRUTINY – CORPORATE RESOURCES
AND COMMUNITY WELLBEING AND SAFETY) –
Approval was sought for the Vale of Glamorgan
Council to authorise Cardiff County Council Officers of the Illegal
Money Lending Unit (IMLU) to investigate and institute proceedings
against illegal money lenders operating within the Vale of
Glamorgan Council area.
The Department of Business Enterprise and
Regulatory Reform had provided ring fenced funding to provide
regional teams to combat illegal money lending through to
31st March, 2009. The Wales Head of Training
Standards submitted a bid to the Department of Business Enterprise
and Regulatory Reform for a Cardiff based project to cover Wales.
Pilot schemes had been operating in Birmingham and
Glasgow.
The primary legislation governing the consumer
credit industry was the Consumer Credit Act 1974. This was
enforced in local authorities by the Trading Standards
Service. The Act was based upon a licensing system and all
consumer credit and consumer hire business operating in the U.K.
(with certain exemptions) must possess an appropriate licence
issued by the Office of Fair Trading (OFT). The OFT must be
satisfied that an applicant for a Consumer Credit Licence was a fit
and proper person before issuing that person with a licence to
trade.
To operate a Consumer Credit Business without
being licensed was a criminal offence and carried a maximum penalty
of £5,000 and/or up to two years imprisonment. Further, the
OFT could revoke licences where it could be established that the
licensee had acted inappropriately. The OFT could issue
warnings and add conditions to the licence where
necessary.
Illegal money lending covered a range of
activities, from persons that are actually licensed but are acting
unlawfully (for example by canvassing off trade premises) to the
extreme of a person offering cash loans without being licensed at
all (loan sharks).
The Illegal Money Lending Units remit was to
investigate illegal money lending activity and establish if a
problem existed and, if so, bring to justice those persons carrying
on this activity. Evidence so far indicated that illegal
money lenders were widespread and prevalent.
With regards to enforcement activity, the
investigation of illegal money lending had proven to be very
resource intensive. Targets needed to be observed and
monitored to determine their activity, to identify them and if
possible establish their address. A significant proportion of
targets were also what was termed ‘lifestyle criminals’, which
meant that evidence of other illegal activity could surface during
the course of an investigation. This may not only involve
other agencies but also extend the life of an investigation,
thereby adding to the pressure on resources.
Along with any enforcement, the Cardiff
Illegal Money Lending Unit will help victims of illegal money
lenders with practical help and support through and in conjunction
with the services of local Debt Advice Teams and the National Debt
Line.
In order to extend the scheme into the Vale of
Glamorgan the existing Cardiff Illegal Money Lending Unit required
proper officer authorisation to carry out the investigations and
for all the associated legal processes and costs thereof to be
delegated to Cardiff County Council. A draft protocol,
attached at Appendix 1 to the report, contained all the required
conditions and consents to enable Cardiff County Council officers
to undertake investigations and legal procedures on behalf of the
Vale of Glamorgan Council.
There was no alternative means to access the
funding for an Illegal Money Lending Unit, and the degree of
expertise and scale of operation required for such a service would
not be viable as a stand alone unit in the Vale of
Glamorgan.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T the discharge of the Council’s function of the enforcement of
Part III of the Consumer Credit Act 1974 be carried out in the Vale
of Glamorgan by Cardiff County Council (pursuant to Section 101 of
the Local Government Act 1972, Regulation 7 of the Local Authority
(Arrangements for Discharge of Functions) (Wales) Regulation 2002
as amended and the Local Government Act 2000).
(2) T H A
T the Protocol for Illegal Money Lending Unit Investigations
attached at Appendix 1 to the report be agreed and that authority
be delegated to the Director of Legal, Public Protection and
Housing Services to enter into an agreement on behalf of the Vale
of Glamorgan Council and to approve minor alterations if
required.
Reasons for decisions
(1&2) Authorising Cardiff Council’s
Illegal Money Lending Team to extend their service to the Vale of
Glamorgan will provide a fully under-written service that would
improve the financial prospects of our most vulnerable
residents.
C3468
SUPPORTING PEOPLE CONTRACTS (DLPPHS) (SCRUTINY – COMMUNITY
WELLBEING AND SAFETY) –
Authority was sought to enter into a further
three-year contract with existing support providers for the
continuing provision of housing related support services for
selected schemes and that standing orders be waived to enable the
contracts to be entered into.
Legacy funding to pay for existing housing
related support services transferred to the Council in April 2003
to the Supporting People agenda under two funding streams:
(a)
Supporting People Grant – this was to fund sheltered housing,
elderly people services and projects jointly funded with Social
Services.
(b)
Supporting People Revenue Grant – this was to fund the Council’s
Tenant Support Scheme.
Both funding streams were paid by WAG in the
form of a grant to the authority and were ring-fenced for
expenditure on housing related support services only.
In compliance with WAG guidance, interim
contracts were put into place between the Council and support
providers to cover these services, which ended on 31st
March, 2006. Cabinet, on 1st February, 2006,
granted authority to enter into new two-year study state contracts
with support providers pending a joint re-tendering strategy being
developed in partnership with Social Services for jointly funded
services.
The re-tendering exercise was duly undertaken
and completed in late 2007 and new contracts were issued.
Some services were however, not covered by the process and were now
due to expire on 31st March, 2008. These were:
(a) The
four external contracts between the Council and small landlords who
have one vulnerable client that they have taken into their own home
where support had been provided over many years, including prior to
the introduction of Supporting People. The approximate total
value was £45,000 per annum.
(b) The
four external contracts between the Council and Housing
Associations and the Abbeyfield Society to fund the warden and
emergency alarm services provided in their own accommodation.
The approximate value totalled £90,000 per annum.
(c)
The one internal Contract between the Supporting People Team and
the Council’s Vale Community Alarm service for the provision of the
alarm service in the Council owned properties designated for the
elderly. The approximate value totalled £43,000 per
annum.
(d) The
one internal Contract between the Supporting People Team and the
Council’s Housing Management Service for the provision of the
warden services provided to Council tenants in sheltered
accommodation. The approximate value totalled £38,000 per
annum.
(e) The
seven external Contracts with seven support providers who provide
support to vulnerable people placed in accommodation by the
Council, which were funded under a tariff based system determined
by WAG. The approximate value totalled £867,000 per
annum.
(f) The two
internal Contracts with the Social Services Department of the
Council for housing related support by the Adult Placement Service
and domiciliary care staff in addition to personal care funded by
Community Care Finance. The approximate value totalled
£201,000 per annum.
There was no statutory requirement to
re-tender any of these services. In addition, one of the
major reasons for the introduction of Supporting People was to
bring stability to the vulnerable people who receive support.
In the case of small landlords, the service users have lived as
part of the family for many years with their landlords.
Internal staff in the Council and the Housing Associations provide
the Warden and alarm services and it would be impractical to award
the contract for service delivery to another organisation, as the
services were provided under a tenancy agreement. Finally, in
the case of the Tenancy Support Scheme, if the service were to be
re-tendered it would not generate any efficiency savings for the
Council as the payment level was set under a tariff system by the
Welsh Assembly Government. In addition, these services had
been extensively reviewed annually by the Supporting People Team
since 2003 and were providing a vital service for vulnerable
clients. These support workers had built up a close
relationship with the service users and changing support worker
would impede a service user’s progress in achieving the desired
outcomes of independence, maintaining their home and integrating
successfully into the community at the earliest possible
time. In extreme cases it could even lead to a service user
becoming destabilised and needing to seek crisis intervention from
the statutory services of Health or Social Services.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T the Council enter into a three-year contract extension for those
projects delivered in partnership with Social Services, within a
landlords own home, within a sheltered complex, through an
emergency alarm provision or those which are funded under the Welsh
Assembly Government’s tariff system.
(2) T H A
T standing orders be waived to enable the contract to be entered
into.
Reasons for decisions
(1&2) To ensure the stability of
very vulnerable service users who receive support in the Vale of
Glamorgan.
C3469
RENT SETTING FOR 2008/2009 FINANCIAL YEAR AT HAFAN TREHARNE HOSTEL
FOR THE HOMELESS (DLPPHS AND DFICTP) (SCRUTINY – COMMUNITY
WELLBEING AND SAFETY AND CORPORATE RESOURCES) –
Cabinet were advised of the notification
received from the Department for Works and Pensions (DWP) regarding
the rent setting for Hafan Treharne Hostel for 2008/2009.
It was proposed that the weekly rent charge
should remain at the DWP threshold of £105.59, in addition there
would be no change to the heating, water and lighting charge of
£11.05, giving a total weekly charge of £116.64.
As the majority of tenants were in receipt of
Housing Benefits any increase above the threshold limit would have
an impact on those tenants.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T the rent for the Hostel for 2008/2009 remain at £116.64 per week
as recommended by the DWP, to be implemented from 7th
April, 2008.
(2) T H A
T the use of the Urgency Procedure under Article 13.09(a) of the
Constitution be approved.
Reasons for decisions
(1) To
ensure that the DWP threshold limits for Homeless persons is not
breached.
(2) The
rent needs to be set before the expiration of the call-in
period.
C3470
REVENUE MONITORING FOR THE PERIOD 1ST APRIL, 2007 TO
20TH FEBRUARY, 2008 (CMT) (SCRUTINY – ALL)
–
The projected outturn for the 2007/08 Revenue
Budget was shown in comparison with the Amended Revenue Budget at
Appendix 1 to the report. The current forecast was for an
underspend on the General Fund of £2.108 million and the Housing
Revenue Account £0.300 million.
Education and Schools – reference was made to
previously reported underspends on the central education budget
which would be used to fund overspends elsewhere in the
Directorate. In addition, savings would be used to support
the residential special schools provision, where a combined deficit
balance was projected to total £378k. at 31st March,
2008 as a result of the financial implications of Care Standards
legislation. Although there were a number of pressures on the
service, the expenditure on placements in independent schools
included in the Access and Inclusion budget was forecast to be
£130,000 less than was estimated. This was due to a number of
pupils returning to placements within the authority. At
present, there was also potential additional income of £350,000 as
a result of more out of county pupils. However, given the
volatile nature of this budget the income was not considered secure
at this time. In addition, within the Strategic Planning and
Performance Budget, as a result of the combination of a recent
re-tendering exercise on certain home to school transport routes
and contract inflation for other routes being lower than expected,
there was a projected saving of £137,000 on home to school
transport. The education based budget currently included
£450,000 to support the School Investment Strategy. In
2007/08 the budget would be used to help fund the costs of the
external design team. Any further savings that were realised
by the end of the financial year would also be available to further
support the School Investment Strategy. Probable
underspending on the service on the service had reduced compared to
earlier reports mainly due to the agreed reallocation of costs from
Lifelong Learning.
Lifelong Learning – costs had been reallocated
to education and schools which resulted in a reduced predicted
adverse variance of £46,000 when compared to earlier reports.
The variance was primarily due to a delay in starting new learning
programmes to the economically inactive and low enrolments over the
summer period (£36,000), premises costs at the Heritage Skills
Centre (£10,000).
Catering – an adverse variance of £30,000 was
predicted for this service, a reduction of £60,000 from that
previously reported. This was as a result of more active
promotion/marketing of school meals to improve uptake, an increase
in meal prices from September 2007, realignment of school kitchen
staff with output of meals and a review of administrative
arrangements between Education and the Catering Service.
As regards Social Services, Appendix 1 to the
report showed the budget for each Division of Service and reflected
the allocation of the original Temporary Uplift of £3,641,000
approved by the Council, the savings of £2,000,000 originally
needed to achieve a balanced budget and the additional temporary
uplift of £1,110,000 to meet the cost of increase Care Home fees
and arbitration. The budget was currently projected to
outturn with a deficit of £231,000 a further reduction of £341,000
on previously reported figures. In addition to the savings
resulting from the revised action plan, income from transferred
grant funding and continued improved income generation had been
reflected in the current projected outturn figures. However,
many of the budget savings were ‘one-off’ and there was still an
underlying departmental overspend on care packages. This
needed to be addressed during 2008/2009.
Children’s Services – the probable outturn was
currently showing a surplus of £760,000. The increased
surplus was mainly due to the use of ‘one-off’ grant
allocations. The main reasons for the underspends were a
reduction in the costs of children placements £66,000, savings on
fostering costs £185,000, vacant posts £353,000, grant income
£214,000 and release of contingency items £85,000 off-set by
additional costs associated with adoption allowances and court
expenses.
Community Care and Health – details of budget
and spend related to each client group was shown at Appendix 1 to
the report. The Service was projected to outturn with a
deficit of £1,011,000 at the year end, a decrease of £89,000 on the
previous months reported figures. The projected outturn
reflected the savings identified in the revised Actions Plans and
continued improved income generation. The projection also
reflected the continued pressures on Community Care packages.
It included the increase in Care Homes fees already agreed and an
estimate of new commitments that may be made before the year
end. This was an extremely volatile budget and would be
adjusted as information became available. Currently the
unallocated Community Care commitments were shown under the Elderly
Client Group and would be allocated to the other client groups as
contracts were finalised. The additional uplift to the budget
of £1,110,000 had been allocated over client groups pro rata to
current commitments.
Policy – the underspending of £2,339,000 was
as reported previously.
Housing Revenue Account – the underspending of
£300,000 was mainly due to staff vacancies and savings on the
supplies and service budget.
This was a matter for Executive decision.
RESOLVED – T H A T the position with regard to
the Authority’s 2007/08 Revenue Budget be noted and that Cabinet’s
thanks be passed to all staff in acknowledgement of the efforts
made to achieve a balanced budget.
Reason for decision
That the Members are aware of the projected
revenue outturn for 2007/08.
C3471
CAPITAL MONITORING FOR THE PERIOD 1ST APRIL, 2007 TO
29TH FEBRUARY, 2008 (CMT) (SCRUTINY – ALL)
–
Cabinet were advised of the progress on the
2007/08 Capital Programme for the period 1st April, 2007
to 29th February, 2008 and where necessary were
requested to approve changes to the programme.
Director of Education –
School Target Hardening Grant – further to an
initial allocation of £29,642 which was already included in the
current Capital Programme, WAG had now made a further grant of
£9,902 for Ysgol Gyfun Bro Morgannwg. It was requested that
this additional sum be incorporated into the 2007/08 Capital
Programme.
Director of Legal, Public Protection and
Housing Services –
Disabled Facilities Grant – due to an on-going
staff shortage in the Grants Sections it had not been possible to
process the anticipated number of disabled facility grant
applications this year. It was therefore necessary to
transfer the sum of £200,000 from the Council-funded DFG budget to
the Penarth Renewal Area within the existing 2007/08 Capital
Programme. Emergency powers had been sought in order to
approve this transfer.
Director of Environmental and Economic
Regeneration –
Land drainage pre-feasibility – Wag had
recently approved a grant of £15,300 for pre-feasibility studies at
various sites throughout the Vale of Glamorgan following the
flooding problems encountered recently. The anticipated cost
of the study was £18,000 of which WAG had agreed an 85% grant
allocation, whilst the Council had identified match funding of
£2,700 from within existing revenue budgets. It was requested
that the 2007/08 Capital Programme be increased by £18,000 in order
to fund the initial cost of the studies.
Transport Grant – the recent bid for further
funding to the Welsh Assembly Government for the Barry Central
Station Scheme had been approved and the Council had duly submitted
a claim on the additional funding of £293,000.
General Asset Renewal 2007/08 – included
within the Visible Services budget was a scheme for the
construction of a gulley recycling facility at Pant y Lladron
whereby the anticipated costs of the works was to be shared between
the Vale, Bridgend County Borough Council and Cardiff County
Council. Each participant’s anticipated share of the cost was
initially £50,000 and a budget of that amount was included within
the 2007/08 General Asset Renewal allocation. Additional
costs were incurred with the design and construction of
infrastructure for the collection/capture, treatment and recycling
of all rainfall at the site. An additional tank was
constructed to reuse treated gully water. The facilities
capacity was also increased to cope with potential private
commercial customers, or other adjacent local authorities, in the
future. The increase was to be shared equally between the
three parties, increasing this Council’s contribution to
£72,000. The additional cost was to be funded from within
existing revenue budgets.
It was anticipated that the following schemes
would not be completed on target.
Director of Education –
Rhoose Primary Additional Accommodation –
delays in the tender process for this scheme had meant a lower than
anticipated spend this financial year and works could not commence
until the next financial year. It was requested that a
further slippage amount of £440,000 be made in order to progress
the building works in 2008/09.
Director of Legal, Public Protection and
Housing Services –
Transfer of Woodlands to Holm View – it was
necessary to vacate Woodlands as its condition had deteriorated
over years and had been uneconomic to upgrade. Initial cost
estimates of £200,000 had been based on the assumption that the
centre could be accommodated in Holm View with some moderate
alterations. However, on further investigation, due to the
type of existing and to meet the requirements of the service
potentially there would be more work involved especially in the
conversion of the mechanical and electrical installation. The
final specification of works was yet to be specified at this stage
and therefore the only costs to be incurred during 2007/08 were the
design fees for the scheme. It was therefore requested that
the unspent balance of the current budget of £184,000 be slipped
into 2008/09 Capital Programme to fund future works.
Director of Environmental and Economic
Regeneration –
Barry Regeneration Partnership – included
within this budget was a research project at £5,000 which was not
possible to commence this year due to the long term sickness of the
professor due to undertake the project. The work was now
expected to be undertaken during April and it was therefore
requested that the budget of £5,000 be slipped into 2008/09.
Cogan Hall Farm – the current unspent budget
of £88,000 could not now be spent by the end of March due to the
requirement to obtain CADW Listed Monument Consent. It was
therefore requested that the £88,000 be slipped into the 2008/09
Capital Programme.
Relocation of Road to Dunraven Beach – delays
due to land issues had meant that though works were progressing on
site they were now not able to be completed before the end of this
financial year and it was therefore requested that the anticipated
unspent balance of £138,000 be slipped forward into the 2008/09
Capital Programme.
Penarth Marina Escarpment – works to stabilise
the escarpment at Penarth Marina had been delayed pending the
outcome of drainage investigations at Penarth Heights
development. It was therefore requested that the unspent
balance of £109,000 be slipped into the 2008/09 Capital
Programme.
Marcross Cesspits – problems encountered in
acquiring the land required to progress this scheme further had
meant that it was now requested that the remaining unspent balance
on this budget of £14,000 be slipped into the 2008/09 Capital
Programme.
Knap Development – works to the two shelters
along the Knap Promenade were proceeding but were not likely to be
complete until May 2008 and it was therefore requested that
£170,000 be slipped into the 2008/09 Capital Programme.
Multi Use Games Area Cadoxton – as works would
not be commenced this financial year, it was requested that the
remaining unspent budget of £13,000 be slipped through to the
2008/09 Capital Programme.
Dyffryn House External Restoration – it had
not been possible to proceed with the intended works from this
budget and it was requested that the remaining budget of £7,000 be
slipped into the 2008/09 Capital Programme.
Penarth Pier Decking – the first phase of
works on refurbishing the decking area at Penarth Pier had been
completed, but at a cost of £82,000 on a budget of £75,000 as a
slightly larger area required replacement than had originally been
anticipated. The additional funding had been identified from
within existing revenue budgets within Visible Services.
Phase 2 of the works were scheduled for early Spring 2008.
Policy –
Court Road Accommodation – the works were not
likely to commence until April and as such the only expense this
financial year would be fees. It was therefore requested that
the remaining budget of £325,000 be slipped into the 2008/09
Capital Programme.
Dyffryn Enveloping – the scheme was likely to
be underspent by approximately £170,000 which included an
underspend on the main enveloping contract itself. It was
requested that the remaining budget of £170,000 be slipped into the
2008/09 Capital Programme.
Glamorgan Record Office – the Council had been
instructed that delays with implementing the scheme had meant that
the Council had been requested to contribute £120,000 of the budget
of £1,000,000 this financial year. It was therefore requested
that the balance of £880,000 be slipped into the 2008/09 Capital
Programme.
In response to a question at Council on
20th February 2008 regarding the Council’s commitment to
the Pont Y Werin Bridge scheme, the Deputy Leader had confirmed
that an amendment to the Capital Programme was to be put forward to
include a provision of up to £200,000 for the forthcoming financial
year towards the project, and it was
RECOMMENDED - T H A T this sum be included in
the 2008/09 Capital Programme.
A number of recommendations were a matter for
Council because they were contrary to and not wholly in accordance
with the budget.
RESOLVED -
(1) T H A
T the following changes to the 2007/08 Capital Programme be
approved:
(i) School Target Hardening Grant -
increase the budget by £9,902 funded from WAG grant.
(ii) Land Drainage Feasibility - increase
the budget by £18,000, funded £15,300 from WAG grant and £2,700
from within existing revenue budgets.
(2) T H A
T the following changes be referred to Council for approval:
(iii) Rhoose Primary Additional Accommodation -
reduce the budget to £360,000 (carry forward £440,000 to the
2008/09 Capital programme).
(iv) Transfer of Woodlands to Holm View - reduce
the budget to £16,000 (carry forward £184,000 to the 2008/09
Capital Programme).
(v) Multi Use Games Area Cadoxton - reduce
the budget to nil (carry forward £13,000 to the 2008/09 Capital
Programme).
(vi) Barry Regeneration Partnership - reduce the
budget to £377,000 (carry forward £5,000 to the 2008/09 Capital
Programme).
(vii) Cogan Hall Farm - reduce the budget to £1,000
(carry forward £88,000 to the 2008/09 Capital Programme).
(viii) Relocation of road to Dunraven Beach - reduce the
budget to £250,000 (carry forward £138,000 to the 2008/09 Capital
Programme).
(ix) Penarth Marina Escarpment - reduce the
budget to £11,000 (carry forward £109,000 to the 2008/09 Capital
Programme).
(x) Marcross Cesspits - reduce the budget
to £1,000 (carry forward £14,000 to the 2008/09 Capital
Programme).
(xi) Knap Development - reduce the budget to
£30,000 (carry forward £170,000 to the 2008/09 Capital
Programme).
(xii) Dyffryn House external restoration - reduce the
budget to nil (carry forward £7,000 to the 2008/09 Capital
Programme).
(xiii) Glamorgan Record Office - reduce the budget to
£120,000 (carry forward £880,000 to the 2008/09 Capital
Programme).
(xiv) Dyffryn Enveloping - reduce the budget to £721,000
(carry forward £170,000 to the 2008/09 Capital Programme).
(xv) Court Road Accommodation - reduce the budget to
£25,000 (carry forward £325,000 to the 2008/09 Capital
Programme).
(xvi) Pont Y Werin Bridge scheme - increase the 2008/09
Capital Programme by £200,000, funded from the Project Fund.
Reasons for decisions
(i) -
(ii) To allow
schemes to be undertaken in this financial year.
(iii) - (xvi) To allow
schemes to be undertaken/completed in future financial year.
C3472
MATTERS WHICH THE CHAIRMAN HAD DECIDED WERE URGENT –
RESOLVED – T H A T the following matters which
the Chairman had decided were urgent for the reasons specified be
considered.
C3473
DRAFT SUPPLEMENTAL PLANNING GUIDANCE: COUNTY TREASURES (DEER)
(SCRUTINY – ECONOMY AND ENVIRONMENT) –
Urgent by reason of the need to
make a decision prior to the next Committee
Cabinet received a report which advised of the
draft Supplementary Planning Guidance (SPG) ‘County Treasures’,
which had been developed to support the policies and proposals
contained within the Adopted Vale of Glamorgan Unitary Development
Plan 2005 (UDP).
Once approved, the SPG shall be used for
development control purposes and shall be a material consideration
in the determination of planning applications. A copy of the
guidance was attached at Appendix A to the report.
The County Treasures survey uniquely contained
a ‘unified’ list of historic built assets found within the Vale of
Glamorgan. It therefore contained listed buildings, Scheduled
Ancient Monuments, as well as 362 entries identified as being of
‘local importance’. The SPG was designed to provide planning
guidance as advice on this locally listed element of the
survey.
The document provided information on the
following issues:
·
Background
·
Identification of Local Entries
·
Criteria for Selection and Review
·
Status and Policy Background
·
Planning Control: Strategic Policy Context
·
Planning Control: Detailed Implications
·
Where to View County Treasures.
This was a matter for Executive decision.
RESOLVED
(1) T H A
T a copy of the report and SPG attached at Appendix A to report be
referred to Planning Committee and the Conservation Area Advisory
Group for consultation purposes.
(2) T H A
T subject to the views of the Planning Committee and the
Conservation Area Advisory Group, a consultation exercise be
undertaken on the contents of the draft SPG targeting ‘interested
parties’.
(3) T H A
T subject to the views of the Planning Committee and the
Conservation Area Advisory Group, the draft SPG be approved for
interim development control purposes and made available on the
Council’s website.
(4) T H A
T a further report be presented to Cabinet outlining the responses
to the consultation exercise, together with any proposed changes to
the draft SPG.
Reasons for decisions
(1) To
obtain the views of the Planning Committee and the Conservation
Area Advisory Group on the draft SPG.
(2) To
obtain the views of interested parties on the draft SPG.
(3) To
allow the draft SPG to be considered in the determination of any
planning applications.
(4) To
advise Cabinet of the results of the consultation exercise together
with any proposed changes to the draft SPG.
C3474
COUNTY TREASURES: THEATRE ROYAL, GLADSTONE ROAD/BROAD STREET, BARRY
(DEER) (SCRUTINY – ECONOMY AND ENVIRONMENT) –
Urgent by reason of the request by
the Leader
Consideration was given to the inclusion of
the Theatre Royal on the County Treasures list.
It was reported that the building’s two main
public frontages were architecturally undistinguished having been
improved in recent years by the provision of a modern canopy and
window details. Nevertheless, it related in scale to other
public buildings in the area, notably the Savoy and Memorial
Hall.
The Supplementary Planning Guidance on County
Treasures had a particular emphasis on the locally listed entries
contained within each community. It considered criteria for
the candidacy and admission of new entries onto the list and the
timing of overall reviews. With reference to the Theatre
Royal it was noted that the guidance did recognise opportunity for
candidacy, as circumstances warrant, between periods of review.
In respect of the Theatre Royal, it was
considered that this was not a building which was of particular
architectural quality, although it was recognised that some,
limited remaining elements of historic fabric remained in
evidence. As an historic building, however, it was more
notable as a centre for public assembly and entertainment and did,
therefore, have some recognisable value in the historic and
cultural development of the town. For this reason, it was
felt that the Theatre Royal should be included as a County Treasure
under criteria 2 of the list.
This was a matter for Executive decision.
RESOLVED – T H A T the Theatre Royal be
included on the County Treasures list.
Reason for decision
The Theatre Royal, as a place of entertainment
and public assembly was recognised as having a strong identity in
the history and cultural development of the town.
C3475
NATIONAL UNION OF TEACHERS – INDUSTRIAL ACTION (DLD) (SCRUTINY –
LIFELONG LEARNING) –
Urgent by reason of the need to
advise Cabinet of the threat of industrial action in Vale
Schools
Cabinet received a report which advised of the
measures being put into place to respond to potential industrial
action by the National Union of Teachers on 24th April,
2008.
On 28th March, the National Union
of Teachers (NUT) ballot for strike action concluded with a
majority of those participating voting in favour of strike action
on 24th April, 2008.
At this point it was not possible to predict
the response to the NUT call for strike action, as any decision
about whether or not to participate remained a matter for
individuals. In this regard, NUT members who did not
participate in the ballot had the same choice as those who did.
Members of other Teaching Associations and
Trade Unions which had not conducted a ballot for strike action,
were not entitled to ask their members to participate in the
Industrial Action. To do so without conducting a ballot,
would amount to unlawful Industrial Action and open the Trade Union
to the risk of legal challenge.
The National Employers Organisation (NEOST)
had confirmed that it would be issuing advice on the Industrial
Action. There would also be a need for local advice on issues
for schools to address i.e.
·
Contingency plans
·
Communications
·
Implications for other agencies (Catering/School Transport)
·
Contractual conditions/pay
·
Administrative arrangements.
It was recommended that the Director of
Learning and Development be authorised to issue the necessary
advice to schools following discussions with the National Employers
and consultation with the Cabinet Member for Education and Lifelong
Learning.
This was a matter for Executive decision.
RESOLVED –
(1) T H A
T the arrangements being put into place to respond to the threat of
industrial action be noted.
(2) T H A
T the Director of Learning and Development be authorised to make
the necessary arrangements and issue advice to schools as
appropriate, following consultation with the Cabinet Members for
Education and Lifelong Learning.
(3) T H A
T the Director of Learning and Development update Cabinet at the
next meeting.
Reasons for decisions
(1) To
bring this matter to the attention of Members.
(2) To
enable consistent advice to be issued to schools.
(3) To
ensure Members are kept informed of developments.