SCRUTINY COMMITTEE (CORPORATE RESOURCES)

 

MINUTES of a meeting held on 22nd April 2008.

 

Present: Councillor H.J.W. James (Chairman); Councillors Mrs. C.V.L. Clay (Vice-Chairman); Councillors Mrs. S.M. Bagstaff, Mrs. J.E. Charles, Miss J. Cole, M.R. Harvey, T.H. Jarvie, F.T. Johnson, Mrs. M. Kelly Owen and A.G. Powell.

 

 

1020   APOLOGIES FOR ABSENCE -

 

 These were received from Councillors Ms. L. Burnett, Mrs. A.J. Moore and C.L. Osborne.

 

 

1021   MINUTES -

 

RESOLVED - T H A T the minutes of the meeting held on 1st April 2008 be approved as a correct record.

 

 

1022   DECLARATIONS OF INTEREST -

 

No declarations were received.

 

 

1023   REQUEST FOR CALL-IN - COWBRIDGE LEISURE CENTRE - ACCESS (MINUTE NO. C3461) -

 

RECOMMENDED - T H A T consideration of the matter be deferred to later in the agenda to be considered in conjunction with Agenda Item 15.

 

 

1024   SERVICE PLAN 2008/09 - PRIVATE SECTOR HOUSING AND COMMUNITY SAFETY (REF) -

 

RECOMMENDED - T H A T consideration of the matter be deferred to later in the agenda to be considered in conjunction with Agenda Item 11.

 

 

1025   SUSTAINABLE DEVELOPMENT (CX) -

 

In accordance with the Committee’s previous recommendation on the subject made at its meeting held on 6th November 2007, the report provided the Committee on progress in co-ordinating sustainable development in the Council.  Since the last report to the Scrutiny Committee a number of further initiatives had been undertaken including various events in relation to Fair Trade, raising awareness days, Member development session and promotion through Council publications, StaffNet and the Council’s website.

 

The report also detailed future priorities, some of which included developing better feedback mechanisms for consultation, embedding sustainable development within project management guidance, incorporating a stronger sustainable development theme within the Community Strategy including a category on sustainability in the Council’s Team Awards and consulting with the public and partners on their aspirations with respect to the subject.

 

RECOMMENDED -

 

(1)       T H A T the actions taken across the Council to promote sustainable development be noted.

 

(2)       T H A T the Chief Executive be requested to submit six monthly progress reports in relation to the Sustainable Development Working Group Action Plan.

 

Reasons for recommendations

 

(1&2)  To ensure that Members are aware of progress in progressing sustainable development within the Council.

 

 

1026   DRAFT SERVICE PLAN 2007/08: CUSTOMER CONTACT CENTRE (CX) -

 

The Operational Manager referred to the main service objectives contained within the above Plan and in particular made reference to the potential for the introduction of additional administrative work in Contact OneVale to maximise staff time, appointing an assistant manager to manage and improve service quality and to establish an additional team leader post to reduce current team sizes.  In addition to these matters, he also referred to the possibility of promoting and exploring the potential for collaborative working with other public services in Wales.

 

The Operational Manager also made reference to matters surrounding the implementation of the Single Number and in particular referred specifically to the Daily Call Volumes.

 

Having regard to the above and related issues it was

 

RECOMMENDED - T H A T the draft Service Plan in respect of the Customer Contact Centre be endorsed.

 

 

1027   DRAFT SERVICE PLAN 2007/08:  HUMAN RESOURCES (DLD) -

 

The Head of Service referred to the seven service objectives contained within the draft Plan.  Following a question from Councillor Ms. J. Cole regarding progress in respect of the implementation of a new management of attendance policy, the Head of Service indicated that a new draft policy had just received, in principle, approval from the corporate management Team and would be submitted to the Council’s Joint Consultative Forum for consultation thereon.  As indicated at a previous meeting of this Scrutiny Committee, the draft policy document contained a number of initiatives available under the new policy and amendments to managers’ obligations regarding the management of attendance.  The policy in principle emphasised consistency and where action was proposed to be taken in cases of absences, that it was appropriate to each case under consideration. 

 

Having regard to the above and related issues it was

 

RECOMMENDED - T H A T the draft Service Plan in respect of the Human Resources Division be endorsed.

 

 

1028   REVENUE MONITORING FOR THE PERIOD 1ST APRIL 2007 TO 29TH FEBRUARY 2008 (DFICTP) -

 

The projected outturn for the 2007/08 Revenue Budget was currently forecasting a favourable variance of £2.108m. and an underspend on the Housing Revenue Account of £300,000. 

 

In relation to Learning and Development, it was noted that Education and Schools as previously reported were projecting an underspend on the central education budget which would be used to fund overspends elsewhere within the Directorate.  In addition, the savings would be used to support the residential special schools provision, where the combined deficit balance was projected to total £378,000 at 31st March 2008 as a result of the financial implications of Care Standards legislation. Similarly, there had been no budgetary changes to that previously reported to the Committee in respect of the following budgets:  Access and Inclusion, conditional income as a result of out of county pupils, Strategic Planning and Performance, projected savings in respect of home to school transport and budgetary support for the School Investment Strategy.

 

With regard to Lifelong Learning, costs had been reallocated to Education and Schools which has resulted in reduced predicted adverse variance of £46,000 when compared to previous reports.  This variance was primarily due to a delay in starting the new learning programmes and premises costs at the Heritage Skills Centre. 

 

In respect of Catering Services there was no change to the budgetary position that was previously reported to the last meeting.

 

As for Social Services, the budget was currently projected to outturn with a deficit of £231,000 a further reduction of £341,000 on previously reported figures.  In addition to the savings resulting from the Action Plan, income from transferred Grant funding and continued improved income generation had been reflected in the current projected outturn figure.  As indicated at the last meeting, many of the budget savings were one off in nature and there was still an underlying departmental overspend on care packages.  With regard to Children’s Services there was a probable outturn showing a surplus of £760,000 and was due to the use of “one off” grant allocations. 

 

In relation to Community Care and Health the projected outturn was likely to be a deficit of £1,011,000 at year end which was a decrease of £89,000 on the previous month’s reported figures. 

 

With regard to Policy there was no change to the figures previously reported to the last meeting.

 

RECOMMENDED - T H A T the position with regard to the Council’s 2007/08 Revenue Budget be noted.

 

Reason for recommendation

 

So that Members are apprised of the projected revenue outturn for 2007/08.

 

 

1029   CAPITAL MONITORING FOR THE PERIOD 1ST APRIL 2007 TO 29TH FEBRUARY 2008 (DFICTP) -

 

The Committee was advised of the progress on the 2007/08 Capital Programme for the above period. 

 

Director of Education –

 

School Target Hardening Grant – further to an initial allocation of £29,642 which was already included in the current Capital Programme, WAG had now made a further grant of £9,902 for Ysgol Gyfun Bro Morgannwg.  It was requested that this additional sum be incorporated into the 2007/08 Capital Programme. 

 

Director of Legal, Public Protection and Housing Services –

 

Disabled Facilities Grant – due to an on-going staff shortage in the Grants Sections it had not been possible to process the anticipated number of disabled facility grant applications this year.  It was therefore necessary to transfer the sum of £200,000 from the Council-funded DFG budget to the Penarth Renewal Area within the existing 2007/08 Capital Programme.  Emergency powers had been sought in order to approve this transfer. 

 

Director of Environmental and Economic Regeneration –

 

Land drainage pre-feasibility – Wag had recently approved a grant of £15,300 for pre-feasibility studies at various sites throughout the Vale of Glamorgan following the flooding problems encountered recently.  The anticipated cost of the study was £18,000 of which WAG had agreed an 85% grant allocation, whilst the Council had identified match funding of £2,700 from within existing revenue budgets.  It was requested that the 2007/08 Capital Programme be increased by £18,000 in order to fund the initial cost of the studies. 

 

Transport Grant – the recent bid for further funding to the Welsh Assembly Government for the Barry Central Station Scheme had been approved and the Council had duly submitted a claim on the additional funding of £293,000. 

 

General Asset Renewal 2007/08 – included within the Visible Services budget was a scheme for the construction of a gulley recycling facility at Pant y Lladron whereby the anticipated costs of the works was to be shared between the Vale, Bridgend County Borough Council and Cardiff County Council.  Each participant’s anticipated share of the cost was initially £50,000 and a budget of that amount was included within the 2007/08 General Asset Renewal allocation.  Additional costs were incurred with the design and construction of infrastructure for the collection/capture, treatment and recycling of all rainfall at the site.  An additional tank was constructed to reuse treated gully water.  The facilities capacity was also increased to cope with potential private commercial customers, or other adjacent local authorities, in the future.  The increase was to be shared equally between the three parties, increasing this Council’s contribution to £72,000.  The additional cost was to be funded from within existing revenue budgets. 

 

It was anticipated that the following schemes would not be completed on target.

 

Director of Education –

 

Rhoose Primary Additional Accommodation – delays in the tender process for this scheme had meant a lower than anticipated spend this financial year and works could not commence until the next financial year.  It was requested that a further slippage amount of £440,000 be made in order to progress the building works in 2008/09.

 

Director of Legal, Public Protection and Housing Services –

 

Transfer of Woodlands to Holm View – it was necessary to vacate Woodlands as its condition had deteriorated over years and had been uneconomic to upgrade.  Initial cost estimates of £200,000 had been based on the assumption that the centre could be accommodated in Holm View with some moderate alterations.  However, on further investigation, due to the type of existing and to meet the requirements of the service potentially there would be more work involved especially in the conversion of the mechanical and electrical installation.  The final specification of works was yet to be specified at this stage and therefore the only costs to be incurred during 2007/08 were the design fees for the scheme.  It was therefore requested that the unspent balance of the current budget of £184,000 be slipped into 2008/09 Capital Programme to fund future works. 

 

Director of Environmental and Economic Regeneration –

 

Barry Regeneration Partnership – included within this budget was a research project at £5,000 which was not possible to commence this year due to the long term sickness of the professor due to undertake the project.  The work was now expected to be undertaken during April and it was therefore requested that the budget of £5,000 be slipped into 2008/09.

 

Cogan Hall Farm – the current unspent budget of £88,000 could not now be spent by the end of March due to the requirement to obtain CADW Listed Monument Consent.  It was therefore requested that the £88,000 be slipped into the 2008/09 Capital Programme. 

 

Relocation of Road to Dunraven Beach – delays due to land issues had meant that though works were progressing on site they were now not able to be completed before the end of this financial year and it was therefore requested that the anticipated unspent balance of £138,000 be slipped forward into the 2008/09 Capital Programme. 

 

Penarth Marina Escarpment – works to stabilise the escarpment at Penarth Marina had been delayed pending the outcome of drainage investigations at Penarth Heights development.  It was therefore requested that the unspent balance of £109,000 be slipped into the 2008/09 Capital Programme.

 

Marcross Cesspits – problems encountered in acquiring the land required to progress this scheme further had meant that it was now requested that the remaining unspent balance on this budget of £14,000 be slipped into the 2008/09 Capital Programme.

 

Knap Development – works to the two shelters along the Knap Promenade were proceeding but were not likely to be complete until May 2008 and it was therefore requested that £170,000 be slipped into the 2008/09 Capital Programme.

 

Multi Use Games Area Cadoxton – as works would not be commenced this financial year, it was requested that the remaining unspent budget of £13,000 be slipped through to the 2008/09 Capital Programme.

 

Dyffryn House External Restoration – it had not been possible to proceed with the intended works from this budget and it was requested that the remaining budget of £7,000 be slipped into the 2008/09 Capital Programme.

 

Penarth Pier Decking – the first phase of works on refurbishing the decking area at Penarth Pier had been completed, but at a cost of £82,000 on a budget of £75,000 as a slightly larger area required replacement than had originally been anticipated.  The additional funding had been identified from within existing revenue budgets within Visible Services.  Phase 2 of the works were scheduled for early Spring 2008.

 

Policy –

 

Court Road Accommodation – the works were not likely to commence until April and as such the only expense this financial year would be fees.  It was therefore requested that the remaining budget of £325,000 be slipped into the 2008/09 Capital Programme.

 

Dyffryn Enveloping – the scheme was likely to be underspent by approximately £170,000 which included an underspend on the main enveloping contract itself.  It was requested that the remaining budget of £170,000 be slipped into the 2008/09 Capital Programme.

 

Glamorgan Record Office – the Council had been instructed that delays with implementing the scheme had meant that the Council had been requested to contribute £120,000 of the budget of £1,000,000 this financial year.  It was therefore requested that the balance of £880,000 be slipped into the 2008/09 Capital Programme.

 

In response to a question at Council on 20th February 2008 regarding the Council’s commitment to the Pont Y Werin Bridge scheme, the Deputy Leader had confirmed that an amendment to the Capital Programme was to be put forward to include a provision of up to £200,000 for the forthcoming financial year towards the project.

 

Appendix to the report also provided non-financial information on Capital Schemes with a budget over £100,000. 

 

RECOMMENDED - T H A T the position with regard to the Council’s 2007/08 Capital Programme be noted.

 

Reason for recommendation

 

To ensure that Members are apprised of the projected capital outturn for 2007/08.

 

 

1030   DRAFT SERVICE PLAN 2007/08 – LEGAL SERVICES (DLPPHS) -

 

The Head of Service referred to the service objectives contained within the draft Plan and in particular commented upon financial management / monitoring arrangements, the involvement in the review of collaborative working for legal services in South East Wales via the SEW Shared Services Group, increased workforce planning and capacity building within the service to support other client departments and involvement of legal officers who attended budget / strategy meetings within the Social Services Directorate.  With regard to those actions completed, the Head of Service commented to the efforts made to pilot an out of hours emergency legal service in respect of Children’s and Adults Legal Service with Cardiff County Council, introducing cross-team working arrangements for all legal fee earners to utilise skills across departments and implementing a quality system in line with Lexcel practice management standards with it being noted that Lexcel accreditation assessment would be carried out in May 2008. 

 

Having regard to the above and related issues it was

 

RECOMMENDED - T H A T the draft Service Plan in respect of Legal Services be endorsed.

 

 

1031   DRAFT SERVICE PLAN 2007/08 - PUBLIC PROTECTION (DLPPHS) -

 

The Operational Manager referred to the main service objectives contained within the above Plan and in particular made reference to the following matters:

 

·    Regarding financial management, the areas covered in the current Service Plan were as

     a consequence of merging the services formerly within the former Community Services

     Directorate.

·    That, given the merger of the services formerly under the Community Services

     responsibility, the current deadline had been extended to allow services formerly under

     the control of the previous Community Services responsibility now under Public

     Protection, to achieve the target.

·    It was noted that there had been a reduction of one Emergency Planning Officer on

     the agreed staff establishment from 3 to 2 during the year and this had impacted

     upon the section’s ability to deliver on all its targets.

·    Regarding licensing matters, it was indicated that Stretch Limousines would now have

     to be regulated and licensed and officers were currently developing policies and

     procedures to cover this service.  It was also noted that a number of enquiries had

     been received from the public regarding the establishment of Sex Establishments.

·    An evaluation was currently being undertaken of the effectiveness of existing Alcohol

     Control Orders and discussions were ongoing with the relevant bodies to develop

     proposals for introducing further orders in public places where there was evidence of

     anti-social behaviour related to the consumption of alcohol.

·    During the forthcoming year it was proposed that work be undertaken in partnership

     with the Police to implement “no cold calling” zones to ensure that swift enforcement

     action could be taken to prevent rogue traders targeting consumers.

·    The changes required under the Food Law Enforcement regime as required by the

     Food Standards Agency would have to be delivered.

·    To undertake work with partners to deliver the Council’s duties under the Clean

     Neighbourhoods and Environment Act in respect of Stray Dogs.

 

The Chairman in referring to the Scrutiny Committee (Community Wellbeing and Safety) comments made in relation to Air Quality Assessments contained in the Plan at its meeting on 10th March 2008 and to their subsequent recommendations below.  He enquired of progress in respect of this issue and further referred to air quality issues in the locality of Aberthaw Power Station:

 

“(6)      T H A T the Scrutiny Committee (Corporate Resources) be requested to ensure that full and active standard high Air Quality Programmes are being implemented.

 

(7)       T H A T further reports on any Air Quality Assessments undertaken during the year be presented to the Scrutiny Committees (Community Wellbeing and Safety) and (Corporate Resources).”

 

The Operational Manager indicated that with regard to the Power Station, SO2 emissions had improved sufficiently so as not to require the formal declaration of an Air Quality Management Area however, officers were aware of a dust nuisance and this was currently being investigated.  The matter had been discussed with the Environment Agency who are the regulators for the site.

 

The Committee was also informed that whilst air quality in the vicinity of Barons Court had initially improved as a result of the signalling works, there was currently some concern about nitrogen dioxide levels at one site on Windsor Road on the approach to Barons Court.  Consequently, officers were undertaking a detailed assessment to examine more closely the situation at this site and model air quality levels for the future.

 

Having regard to the above and related issues it was

 

RECOMMENDED -

 

(1)       T H A T the draft Service Plan in respect of Public Protection be endorsed.

 

(2)       T H A T recommendation (6) above of Scrutiny Committee (Community Wellbeing and Safety) of 10th March 2008 be accepted.

 

(3)       T H A T with regard to recommendation (7) above of the Scrutiny Committee (Community Wellbeing and Safety) of 10th March 2008; the Scrutiny Committee (Community Wellbeing and Safety) be advised that this Scrutiny Committee accedes to their request subject to any recommendations in regard to future Air Quality Assessments being referred to this Scrutiny Committee for consideration.

 

Reasons for recommendations

 

(2)       To ensure that Members are fully apprised of developments with regard to Air Quality Assessments undertaken during the current municipal year.

 

(3)       In recognition that the Scrutiny Committee (Corporate Resources) was the lead Scrutiny Committee with regard to Regulatory matters.

 

 

1032   DRAFT SERVICE PLAN 2007/08: DEMOCRATIC SERVICES (DLPPHS) -

 

The Operational Manager referred to the main service objectives contained within the above Plan and in particular commented upon achievements to date, in particular completion of Year 1 of the Scrutiny Review Action Plan, one of only three local authorities in Wales to achieve the Member Development Charter and the continued success of the procurement of TNT Post in respect of second class mail which was delivering efficiency savings.  A number of local authorities were now seeking advice from the Council on how they might progress this idea themselves.

 

Regarding actions not completed, the Operational Manager indicated that with regard to the Green Dragon Award, a decision had been made in early 2008 to submit an application for Level 2 of the scheme rather than Level 1, meaning Level 2 would still be attained within a two year period.  Regarding Land Charges revenue, the Operational Manager referred to a 20% reduction in revenue as a direct result of increased competition from the private sector.

 

RECOMMENDED - T H A T the draft Service Plan in respect of Democratic Services be endorsed.

 

 

1033   SCRUTINY COMMITTEE: TRACKING OF RECOMMENDATIONS (DLPPHS) -

 

Members were advised of progress in relation to recommendations made by the Committee during the period January to March 2008 which were detailed in Appendix A to the report.  Members were also requested to consider actions against the uncompleted recommendations for the period April to December 2007 which were attached at Appendix B.

 

RECOMMENDED - T H A T the progress of actions taken to date in relation to the above be accepted and the actions identified as completed be accepted.

 

 

1034   SCRUTINY COMMITTEE: DRAFT ANNUAL REPORT 2007/08 (DLPPHS) -

 

In accordance with section 6.03(d) of the Article 6 of the Council’s Constitution, the above report had been produced which detailed the work undertaken by the Scrutiny Committee (Corporate Resources) during the current municipal year.  The Report also detailed the future work programme for the forthcoming municipal year.

 

The Committee in approving the report

 

RECOMMENDED - T H A T the contents of the draft Annual Report for the period May 2007 - to April 2008 be approved and presented to Full Council, subject to any further minor amendments being agreed in consultation with the Chairman of the Committee.

 

 

1035   “REQUEST FOR “CALL-IN” - COWBRIDGE LEISURE CENTRE - ACCESS (MINUTE NO. C3461) (DFICTP) (EXEMPT INFORMATION - PARAGRAPH 14) -

 

This matter had been subject to a call-in by Councillor H.J.W. James the Chairman of this Scrutiny Committee, the reasons for which were to obtain essential information such as how much the open market value of granting access was worth; the extent and total value of the development; the impact on the existing Council owned land and property; an examination of the Stokes - Cambridge Rule and whether the Section 123 requirement had satisfactorily been met.

 

In response to the call-in, the Director of Finance, ICT and Property had submitted a supplementary report which dealt with the issues raised as a consequence of the call-in.

 

The report advised that the request for access had raised serious concerns as to whether it could be technically and safely achieved.  Following detailed discussions a solution had been developed which satisfied the highway criteria and afforded improved pedestrian and vehicle access.  The existing road would be realigned and the new / existing upgraded to adopted standards.  The realignment would also necessitate the reconfiguration of the existing car parking to mitigate the loss of any car parking spaces.  All associated works would be carried out at no cost to the Council.  Negotiations were currently ongoing with regard to minimising any impact associated as a consequence of the work on the operations of the Leisure Centre.  The new road would provide improved access to the Leisure Centre and the other facilities on the site including facilitating any future development on or redevelopment of the Council’s land.

 

The District Valuer had negotiated the consideration due to the Council for the privilege to be granted of access and had certified that it was proper and in accord with the Council’s legal obligations.  The consideration agreed properly valued the right granted without rendering the scheme unviable.

 

Discussion ensued regarding the proposal.  In particular, matters relating to highway issues, viz alignment of the proposed new access road and the potential implications for the Council as a consequence of adopting the new highway.  The Committee had concerns that the new highway / car park layout as identified on the plan attached to the report, indicated a spur off the car park which could be construed as a potential access opportunity to allow development of what was currently a land locked field between the proposed Health Centre site and North Road.  Accordingly, the Committee considered that it was appropriate that the Council’s interests should be protected in respect of any future utilisation of the access from the proposed Health Centre development to land referred to above.

 

Having regard to the above and related issues, it was

 

RECOMMENDED - T H A T Cabinet be requested to seek to ensure that the Council’s interests are protected in respect of the utilisation of the access from the proposed Health Centre for the future development of land outside the proposal under consideration.

 

Reason for recommendation

 

To safeguard the Council’s future interests.