MINUTES of a meeting held on 31st January, 2007.

 

Present:  Councillor Ms. M.E. Alexander (Chairman); Councillors R.F. Curtis, S.C. Egan, C.P. Franks, N.J. Gibbs, G. John, Mrs. M. Randall and Mrs. M.R. Wilkinson.

 

Also present:  Councillors Mrs. M. Kelly Owen and A.J. Readman.

 

 

C2862                        APOLOGIES FOR ABSENCE -

 

These were received from Councillors N. Moore and C.J. Williams.

 

 

C2863                        MINUTES -

 

RESOLVED - T H A T the minutes of the meeting held on 17th January, 2007 be approved as a correct record.

 

 

C2864                        DECLARATIONS OF INTEREST -

 

Councillors C.P. Franks and N.J. Gibbs declared an interest in Agenda Item No. 7 in respect of the Local Health Board and vacated the room during its consideration.

 

 

C2865                        VALE OF GLAMORGAN LOCAL DEVELOPMENT PLAN - DRAFT SUSTAINABILITY APPRAISAL SCOPING REPORT (REF - MINUTE NO. 669) -

 

Cabinet had considered the above at its meeting on 13th December, 2006 and, subject to consultation with the Planning Committee and appropriate Scrutiny Committee, had, inter alia, approved the same for a five week written consultation period.  The Planning Committee had subsequently endorsed the resolutions of Cabinet.

 

RESOLVED - T H A T the endorsement of the Planning Committee be noted.

 

 

Reason for decision

 

To take account of the views of the Planning Committee.

 


 

 

C2866                        APPOINTMENTS TO OUTSIDE BODIES/JOINT COMMITTEES (CX) (SCRUTINY - CORPORATE RESOURCES) -

 

Minute No. C2832 in respect of the above had been called in by Councillor H.J.W. James and considered by the Scrutiny Committee (Corporate Resources) on 23rd January, 2007.  The purpose of the call-in had been to seek clarification and justification for the appointments, the relevance of the portfolio holders to some of the appointments and to clarify what was legally appropriate and conformed with the Constitution and Member Allowance Scheme.  The Scrutiny Committee had subsequently requested Cabinet to consider the following recommendations

 

(i)         Arts Council of Wales: South Wales Area Committee - Cabinet be requested to ascertain whether such an appointment still exists.

 

(ii)        Barry YMCA Management Committee - Cabinet be requested to review the Council’s role in / relationship with Barry YMCA, to include consideration of operational and financial matters and the status of the Council’s representatives of the Management Committee.

 

(iii)       Friends of Bellevue Park - Cabinet be requested to consider the appointment of an additional Member, i.e. Councillor P. Church, in order that both Local Members are representatives.

 

(iv)       Local Health Board - Cabinet be asked to note that membership would need to be reconsidered in the light of proposed organisational changes within the Directorate of Community Services.

 

(v)        South Wales Police Authority - Cabinet be invited to reconsider the matter in the light of the decision of the South Wales Police Authority Joint Committee in 2004 that the Vale of Glamorgan Council would be the one constituent Council on the South Wales Police Authority represented by a Conservative Member (i.e. thereby reflecting political balance across the constituent Councils).

 

(vi)       Steel Action - Cabinet be requested to consider whether the representative should, in fact, be the Leader given her portfolio included responsibility for regeneration.

 

(vii)      Vale of Glamorgan Buildings Preservation Trust - Cabinet be requested to ascertain whether the appointment of the Chairman, or any Member, of the Planning Committee as the Council’s representative constitutes a potential conflict of interest.

 

(viii)     Waterfront IT Centre Board - Cabinet be requested to consider the addition of the Cabinet Member for Education and Training to the list of representatives.

 

(ix)       Cabinet requested to delete the words “attendance allowance and” from the original recommendation (2) of Minute No. C2832 to reflect the fact that, in fact, no such attendance allowance was any longer applicable to Members attending individual meetings. 

 

In respect of recommendation (i) above, confirmation was given at the meeting that the appointment still existed.  With regard to the South East Wales Transportation Alliance (SEWTA), the Leader confirmed that Minute No. C2832 should read the Cabinet Member for Planning and Transportation as well as the Chairman of the Planning Committee.

 

This was a matter for Executive decision.

 

RESOLVED -

 

(1)       T H A T a further report be made to Cabinet in respect of recommendations (ii), (iv) and (vii) above.

 

(2)       T H A T Councillor P. Church be appointed as an additional Member to the Friends of Belle Vue Park.

 

(3)       T H A T the decision of Cabinet on 21st December, 2006 in respect of the South Wales Police Authority be re-affirmed.

 

(4)       T H A T, in respect of Steel Action, the Leader be appointed as the Council’s representative with Councillor R.F. Curtis deputising where necessary.

 

(5)       T H A T, in respect of the Waterfront IT Centre Board, the Cabinet Member for Education and Training be added to the list of representatives. 

 

Reason for decisions

 

To ensure that the Council is represented appropriately.

 

 

C2867                        FLYING START (DCS) (SCRUTINY - COMMUNITY WELLBEING AND SAFETY)-

 

Cabinet had, on 21st December, 2006 approved the acceptance of the WAG Flying Start grant (Minute No. C2833).  The WAG’s late issue of guidance had resulted in many local authorities being unable to spend the full revenue allocation within the current financial year and, accordingly, WAG had offered the facility for local authorities to transfer some of the revenue allocation for 2006/07 to spend on capital schemes.  The Flying Start Executive Strategic Planning Group proposed that a transfer of £86,500 be requested to

 

·         provide facilities in Cadoxton Primary and Jenner Park Primary Schools to enable the provision of Parenting classes, and

·         modify the nursery in Cadoxton School to provide an additional 8 free child care places for Flying Start 2 year olds and undertake alteration works to provide a crèche for children of parents attending the Parenting classes.

 

It was accepted that such modifications would assist the delivery of the agreed Flying Start Plan, and complement the use of schools as a community focal point. 

 

This was a matter for Executive decision.

 

RESOLVED - T H A T the transfer of £86,500 from the WAG Flying Start grant for 2006/07 revenue allocation for capital use be authorised.

 

Reason for decision

 

To enable full use of the WAG’s Flying Start funding.

 

 

C2868                        REPORT ON THE JOINT WORKING SPECIAL GRANT (FLEXIBILITIES) 2006/08 (DCS) (SCRUTINY - COMMUNITY WELLBEING AND SAFETY) -

 

Funding for the Joint Flexibilities Working Grant had been initially given to cover the period April 2002 to March 2005.  The grant was being reviewed by the Minister for Health and Social Care over the next two years and, in order to secure funding for 2006/08, additional update reports with exit strategies had to be forwarded to the WAG.  The Council had now received formal notification that the grant would be awarded at the current rate of £425,667 for each year.  It was noted that this was £1,122 less than the amount given in 2005/06.  The review was intended to clarify the future funding position after March 2008 and it was likely that £325,667 of the £425,667 would be subsumed into the Revenue Support Grant.  That funding would support front line services for people in the Vale of Glamorgan, with the remaining £100,000 being ringfenced for partnership working between the Local Health Board and the Council.  The report then detailed each scheme and funding allocation, summarised below:

 

·         the Health, Social Care and Wellbeing Strategy Team - £100,000 to support joint working between the Council and the Local Health Board

·         increased day care provision at Bryneithin - £10,205 per annum for older people with mental ill health delivered in partnership with Crossroads EMI

·         joint planning administrative support - £20,600 per annum to fund the Local Health Board element of joint working in relation to the delivery of Health, Social Care and Wellbeing Strategy, the Children and Young People’s Framework and the Community Safety Partnership

·         Manger of Services for Disabled Children - £40,000 designated towards the cost of post annually

·         expansion of the Vale Community Rehabilitation Team and integration with the Vale Short Term Intervention Service - £76,230 each year

·         reablement service in the western Vale - £184,754.

 

This was a matter for Executive decision.

 

RESOLVED - T H A T the Joint Working Special Grant allocation for 2006/08 be noted and approved as detailed above.

 

Reason for decision

 

To bring Members’ attention to the Joint Working Special Grant and initiatives funded through this grant stream.

 

 

C2869                        FUNDING OF CAVITY WALL INSULATION FOR CORPORATE BUILDINGS (DCS) (SCRUTINY - CORPORATE RESOURCES) -

 

Policy agreement 7a between the WAG and the Council required a 6% reduction in the carbon dioxide emissions associated with building use in the year leading up to 31st March, 2007.  The most recent annual figures, however, to March 2006 showed that there had been an increase in building related carbon dioxide emissions over the baseline of 5.9%.  Whilst a capital bid was being made for a “spend to save scheme” for energy efficiency once again this year, it was noted that should it be successful work would not start until next summer.  As an interim measure, therefore, investment in insulation measures in the next few months would have a big impact on the energy use within particular buildings and would start a trend of energy reduction.  Single contractor quotations had been provided for insulation of the Civic Offices and Barry Leisure Centre.  Details of the resource implications were contained within the report.  Basically, the costs indicated that cavity wall insulation in both the Civic Offices and Barry Leisure Centre could result in a reduction of 14 tonnes of CO² per annum at a one-off cost of £40,500.  Revenue savings would cover that investment within just over three years and annual savings of over £12,000 would be realised year after year thereafter.  The work would be initially financed through the project fund, the aim of which was to fund the project with the repayment of such advances (including interest) being credited back to the fund.  Four annual repayments of £11,263 would be made back into the fund by the relevant operational budget and it was noted that a 1.1% saving would be achieved by taking this action over the policy agreement baseline.

 

This was a matter for Executive decision.

 

RESOLVED -

 

(1)       T H A T funding be made available in the 2006/07 capital programme to carry out insulation works on Barry Leisure Centre and the Civic Offices.

 

(2)       T H A T the capital costs of the works be funded from the Project Fund and based on a projected cost of £40,500, four annual payments of £11,263 to be made back into the fund by the relevant operational budget.

 

Reasons for decisions

 

(1)       In order to release money for work to go ahead in winter 2006/07 which would have an impact on the final policy agreement figures up to April 2007.

 

(2)       To confirm repayment arrangements.

 

 

C2870                        PUBLIC SECTOR STOCK CONDITION SURVEY (DCS) (SCRUTINY - COMMUNITY WELLBEING AND SAFETY) -

 

The Tribal/HCH Housing Stock Retention report highlighted the need to undertake the procurement of a new stock condition survey and its installation on the existing or new asset management system.  Tribal/HCH also raised concerns about difficulties experienced with the stock condition database.  It was reported that a public sector stock condition survey invitation to tender was being developed, the Council having the two main options of commissioning the work either by a European Union (EU) route or the OGC Catalyst framework.  The OGC Catalyst was a catalogue of framework agreements established by the Office of Government and Commerce (OGC) to provide standard arrangements which public sector bodies could call off for works, goods and services without having to adopt full EU processes.  For the reasons outlined in the report, it was proposed that the Council follow the OGC Catalyst framework to commission a new public sector stock condition survey.  The proposed survey would initially be a 40% two year rolling survey to assess the condition, existing and future liabilities of

 

·         the Council’s housing stock

·         the property assets related to the housing stock

·         the Council’s leasehold interests and liability relating to the housing stock.

 

The proposed contract would be for two years, which period could be extended to include the remaining 60% of the housing stock at the discretion of the Council.  If the contract were to be extended, it was proposed that the survey continue at a rate of 20% of the stock per annum through to 2011.  The initial part of the public sector stock condition survey would be to undertake an impressionistic study which would be a broad profile of the Council’s housing stock which would be used to define the choice of properties for the main survey.  The cost of commissioning and delivering the stock condition survey would be met from within the Housing Revenue Account, the cost of the contract and activities being in the region of £100 to £200,000.  The Property Section would take on the management role for the provision of the public sector stock condition survey and the resources required to undertake the work would be subject to a further Cabinet report.

 

The need to make progress was fully recognised.  Clarification was given in relation to the time taken to commission a new public sector stock condition survey, the content of the tender specification - the outcome of which would in turn allow more accurate costings to be assessed, and the day to day management arrangement of the process.  It was anticipated that the survey would commence June/July 2007 and take some two years to complete the initial 40%.  The aim of the study would be to transform what was essentially a reactive maintenance system into a proactive service.  Cabinet was also informed that WAG had been requested to permit the underspend on the Major Repairs Allowance to be carried forward and that the recent Cabinet report relating to the MRA spend in future years had been forwarded to WAG simultaneously.  No response had yet been received. 

 

This was a matter for Executive decision.

 

RESOLVED -

 

(1)       T H A T the proposal to follow the OGC Catalyst framework for the commissioning of the public sector stock condition survey be endorsed.

 

(2)       T H A T a further report on the outcome of the commissioning process for the public sector stock condition survey be submitted in due course.

 

(3)       T H A T a further report on the proposed management arrangements for the public sector stock condition survey be submitted in due course.

 

Reasons for decisions

 

(1)       To ensure that the Council undertakes a new public sector stock condition survey.

 

(2)       To ensure all Members are informed of the outcome of the commissioning process for the public sector stock condition survey.

 

(3)       To ensure adequate resources are provided to manage the public sector stock condition survey.

 

 

C2871                        VALE OF GLAMORGAN LOCAL DEVELOPMENT PLAN (LDP) - PROPOSED VISION (DEER) (SCRUTINY - ECONOMY AND ENVIRONMENT) -

 

Approval was sought to adopt the Vale of Glamorgan Community Strategy Vision as the guiding vision for the Vale of Glamorgan LDP 2011-26.  It was explained that a key feature of the new LDP system was the emphasis on creating synergy between LDPs and Community Strategies.  Guidance had been issued which supported the above.  In accordance with that guidance, the Council’s approved Delivery Agreement (August 2006) proposed that the Council would assess the appropriateness of the Community Strategy (2003-13) Vision as a vision for the LDP.  The vision paper as appended to the report provided a detailed assessment of the suitability of the Community Strategy Vision as a Vision for the LDP and had been informed by the advice contained within the LDP manual, namely that

 

·         the vision was up to date and had wide spatial relevance

·         the vision flowed from having a clear view of what sort of place the authority wanted to become

·         the vision was well rounded so that there should be a balance between economic, social and environmental objectives.

 

A summary of the assessment of the above was contained within the report as were details relating to the next steps in delivering the LDP objectives and strategic options.  It was noted that the assessment of the Community Strategy Vision had been prepared by officers within the Planning and Transportation Policy Group within existing budgets.  However, in the medium to longer term, the preparation of the LDP would have significant financial and officer resource implications.

 

This was a matter for Executive decision.

 

RESOLVED -

 

(1)       T H A T the Vision contained within the Vale of Glamorgan Community Strategy (2003-13) be adopted as a Vision for the Vale of Glamorgan LDP (2011-26).

 

(2)       T H A T the Vision be used to inform the development of the LDP strategy.

 

Reason for decisions

 

(1&2)  To satisfy the statutory requirements of the LDP regulations.

 

 

C2872                        SUPPORTED LOCAL BUS SERVICE TENDERS 2007 (DEER) (SCRUTINY - ECONOMY AND ENVIRONMENT) -

 

Details of those contracts for Supported Local Bus Services due to terminate in 2007 were contained within the report and approval sought to re-tender for those contracts.  It was noted that there was no option available to extend the current contracts and that the intention was to tender for existing provision on all those services indicated in the report along with alternative options which terminated in September 2011.  That, with the exception of the Council’s contract for the Village Bus Group of Services (V1 to V5) which terminated in May 2011, would bring together all other existing contracts for termination at the same time and would enable a full review of provision.  Patronage on Supported Local Bus Services was currently being surveyed and data for those services would be provided in the report to award contracts as that data could then be assessed against the cost of tender bids.  The budget for Supported Local Bus Services was currently fully committed and, therefore, any major increase in tender submissions might require the loss of some service provision unless additional resources could be found.  Cross subsidy payments were made to this Authority by neighbouring authorities for certain services which ran in their areas and those authorities would be contacted to advise them of this Authority’s invitation to tender to enable their views to be taken into account prior to the award of contract.

 

This was a matter for Executive decision.

 

Following further consideration of the above and the remainder of the report, it was

 

RESOLVED -

 

(1)       T H A T tenders for the continued provision of the following supported or partly supported local bus services be tendered in accordance with the Transport Act 1985:

 

Service 87

Dinas Powys - Cardiff Bay

Monday - Saturday Daytime

Service 94,96

Barry - Cardiff Barry

Sunday Evenings

Service 94,96

Barry - Cardiff Barry

Monday - Saturday Evenings

Service 100

Barry Circular

Sundays

Service 145

Llantwit Major - Bridgend

Monday - Saturday All Day/Evening

Service 146

Cardiff Airport - Bridgend

Monday - Saturday All Day/Evening.

 

(2)       T H A T the tender submissions received be reported to Cabinet for the approval of new contracts, subject to available funding.

 

Reasons for decisions

 

(1)       To provide a continued and effective supported local bus service provision that enhances the commercial bus service network.

 

(2)       To gain Cabinet approval for recommendations that will also enable any necessary decisions that may come to light following tenders.

 

 

C2873                        KNAP SKATEBOARD FACILITY - REFURBISHMENT (DEER) (SCRUTINY - ECONOMY AND ENVIRONMENT) -

 

Cabinet had, in June 2006, resolved that a further report be submitted to Cabinet on the suitability of the current Knap Skateboard site and possible alternatives for its relocation (Minute No. C2512).

 

Details were presented of possible alternative sites for the skate park facility currently located at the Knap in Barry and consideration given to progressing the refurbishment of the facility in accordance with the Richard Taylor Memorial Fund.

 

The assessment of suitable alternative sites for the facility had been based on a number of considerations using relevant guidelines such as the National Playing Fields Association Six Acre Standard, British Standards Institute, PAS35: 2002 Wheeled Sports and ROSPA - Play Safety - Skateboarding recommendations.  A table identifying the summarised criteria and assessment of the sites considered was appended to the report.  Of the possible locations, the Knap Gardens, Maslin Park and Romilly Park had been further considered.  For the reasons contained within the report, it was proposed that the facility remain at the Knap and be refurbished.  Whilst it was recognised that there were challenges with the existing location, the design of the new facility, planned future anti-skating measures on the Promenade and Shelter roofs, along with improved management arrangements, would help ameliorate any residents’ concerns and also to encourage more appropriate use of the area.  The preferred method for delivering the project was to utilise the Council’s capital contribution to remove the existing equipment and to resurface the skate floor area to the required standard.  The financial contribution from the Memorial Fund would then be used for the procurement and installation of the equipment.  The final design of the facility, including all materials used, would be subject to approval by the Director of Environmental and Economic Regeneration in consultation with the Cabinet Member for Visible Services.  On final construction the equipment would be gifted to the Vale of Glamorgan Council.  An amount of £25k. from the 2006/07 Visible Services Asset Renewal Fund had been identified as the Council’s contribution to the project.  That would be used to fund the initial preparation work as indicated above.  The Richard Taylor Memorial Fund had identified a sum of £44k. towards the cost of the project.  The custodians of the Fund would be responsible for negotiating all costs associated with the supply and fitting of the skate equipment.

 

This was a matter for Executive decision.

 

RESOLVED -

 

(1)       T H A T, due to the suitability of the Knap site compared with the others assessed, the Knap Skate Park be refurbished at its current location utilising the contribution from the Richard Taylor Memorial Fund (RTMF).

 

(2)       T H A T the Director of Legal and Regulatory Services negotiate and agree terms and conditions to accept the funding from the RTMF in consultation with the Director of Environmental and Economic Regeneration.

 

(3)       T H A T the Director of Legal and Regulatory Services be authorised to sign any agreements required on behalf of the Council.

 

Reasons for decisions

 

(1)       To permit the refurbishment of the existing facility utilising funding provided by the RTMF.

 

(2)       To protect the interests of the Council and the Charity in the arrangement.

 

(3)       In order to execute and complete legal documentation.

 

 

C2874                        ELECTED MEMBERS ICT USER GROUP (DFICTP) (SCRUTINY - CORPORATE RESOURCES) -

 

The Members ICT User Group had first been established in 2003 and its terms of reference agreed under Minute No. C1024 in November 2003.  The Group had been very useful and informative both from a Member’s perspective and from a support perspective in that it had allowed ICT staff direct access to Members to obtain their views on a variety of subjects and develop the support provided to meet the Members’ needs. 

 

This was a matter for Executive decision.

 

RESOLVED -

 

(1)       T H A T the Group continue with the following terms of reference:

 

·         to consider issues relating to the use of ICT from an Elected Member’s perspective and to provide views and advice;

·         to consider priorities for the further development of ICT facilities for Elected Members and to provide views and advice;

·         to consider the training requirements and the development needs of Elected Members in relation to ICT and to provide views and advice;

·         to improve feedback on ICT facilities so that services could be reviewed and improved;

·         to raise issues with regard to service providers where these had not been dealt with satisfactorily through the usual channels (e.g. the ICT Help Desk);

·         to act as a link to reflect the views of the main body of Elected Members;

·         the minutes of the User Group to be reported to Cabinet for approval;

·         that the Chairman of the Group be the Cabinet Member for Finance, ICT and Property;

·         that the user group is open to all members to attend, but the Group Leaders would be requested to nominate at least one representative to the user group.

 

(2)       T H A T the Group be chaired by the Cabinet Member for Finance, ICT and Property.

 

(3)       T H A T all Members continue to have the opportunity to attend meetings, but that the Group Leaders on the Council would be requested to appoint at least one nominee.

 

Reasons for decisions

 

(1)       To ensure the terms of reference are still applicable.

 

(2)       To provide feedback to Cabinet and refer any issues for decision.

 

(3)       To provide all party support for Member Development in ICT.

 

 

C2875                        EMPLOYMENT EQUALITY (AGE) REGULATIONS 2006 (DLD) (SCRUTINY - CORPORATE RESOURCES) -

 

The report detailed the implications of the Employment Equality (Age) Regulations 2006 for the Council and the responsibilities of officers of the Council under the aforementioned legislation.  The legislation had come into effect on 1st October, 2006 and covered direct discrimination, indirect discrimination, harassment and victimisation and covered all ages of the workforce, making anti-discriminatory practice because of age unlawful.  The scope of the legislation focussed not only on retirement but also on recruitment, terms and conditions, redundancy, culture and communication, and training.  The report outlined relevant issues and options pertaining to the above.  As regards retirement, for example, the Regulations set a default retirement age of 65 although employers could set their retirement age at 65 or above or have no retirement age.  However, if the retirement age was set below age 65 employers would need to objectively justify their reasons for doing so.  Nor was the Council required to agree to an employee working beyond age 65.  In order to ensure that managers were being consistent in their approach to any requests to work beyond 65, the Council’s current Retirement Age Policy included criteria that needed to be met for a request to be agreed.  Another issue raised in the report related to redundancy whereby the selection process for redundancy would have to be free of age discrimination and practices such as “last in first out” and length of service were likely to be considered discriminatory.  Attention was drawn to other implications arising from the Regulations, both to the Council and to its officers, which were not detailed in the report.  Concern was expressed regarding, for example, the redundancy provisions for those aged 50 or over whereby certain rights to access pension would be removed.  Human Resources and Equalities (Operational Services) was currently running workshops to advise managers of their responsibility under the legislation with the expectation that the information would then be cascaded down to the service areas.  That information was also available to Members should they so desire.

 

This was a matter for Executive decision.

 

RESOLVED -

 

(1)       T H A T the report and the offer to receive Awareness Raising/Training be accepted.

 

(2)       T H A T a report detailing the implications and any points of concern arising from the Regulations for the Council and its officers be submitted to a future meeting.

 

Reasons for decisions

 

(1)       To further demonstrate achievement of the training requirements as contained within the Regulations.

 

(2)       To allow consideration of the issues raised.

 

C2876                        SOUTH EAST WALES ECONOMIC FORUM (SEWEF): CONSTRUCTION SKILLS (DEER & DLD) (SCRUTINY - ECONOMY AND ENVIRONMENT) -

 

Details were presented of an initiative to support built environment development (construction industry) in South East Wales (designated the ‘Capital Network’ in the Wales Spatial Plan) and formal approval and endorsement of the initiative sought.  The SEWEF had been told that South East Wales was witnessing a substantial increase in built environment projects and that that represented a significant opportunity for the ‘Capital Network’ to harness both direct and indirect benefits for the region.  The SEWEF had considered that there was a need for a more balanced approach to construction training than at present with greater emphasis on the provision of appropriate skill level courses - a view expressed also by the construction industry itself.  It was understood that the SEWEF would provide advice and/or assistance to local authorities in drafting terms and conditions into contractual documents for future projects.  SEWEF were also in touch with WAG (DEIN) officials regarding the potential afforded by the proposal for a Defence Training College at St. Athan.  It was evident that local authorities and other public sector bodies had a key role in the process, potential actions including the following:

 

·         with clients/main contractors, establishing local agreement and contracts that set and monitor targets for the use of local companies; employment of local people; training of economically inactive people; number of other trainees within the total supply chain of the project; and appropriate proportions to meet equal opportunities targets

·         establish a single point of contact for all stakeholders involved in the built environment programme and ensuring that appropriate local fora existed where necessary to monitor progress (including involvement of the Sector Skills Councils through the Sector Skills Agreement)

·         liaising with local clients and lead contractors to establish longer term needs for people and skills

·         liaising with all training providers in the area to encourage the match between local commitment and supply both of absolute numbers and skill mix

·         facilitate local supply chain sourcing through provision of support and advice to local businesses

·         work with schools, further education and higher education institutes in the locality to develop learning pathways for the built environment sector

·         encourage SMEs to take advantage of the business opportunities inherent in South East Wales

·         spread best practice in constructing and procurement procedures.

 

A copy of the paper presented at the SEWEF meeting was appended to the report, and Cabinet was requested to approve and endorse the planned approach to improve construction skills in South East Wales. 

 

This was a matter for Executive decision.

 

RESOLVED - T H A T the planned approach to construction skills in South East Wales be approved and endorsed.

 

Reason for decision

 

To enable the regional approach to be taken on this issue.

 

 

C2877                        REVENUE MONITORING: 1ST APRIL, 2006 - 31ST DECEMBER, 2006 (CMT) (SCRUTINY - CORPORATE RESOURCES) -

 

The projected outturn for the 2006/07 Revenue Budget was for a deficit of £4,301,000 on the General Fund and an underspend of £50,000 on the Housing Revenue Account.  In respect of Learning and Development, it was reported that an anticipated saving of £120,000 on Education and Schools would be used to off-set the overspending on Lifelong Learning of £120,000.  The deficit of £4,634,000 on General Fund Services had been made up as follows:

 

·         Social Services - projected overspend of £4,704,000

·         Catering - projected overspend of £130,000

·         Private Sector Housing - underspend of £200,000 mainly attributable to an increase in subsidy income and savings on staff salaries.

 

Included in the figures in respect of the Directorate of Environmental and Economic Regeneration were an anticipated deficit of £150,000 on Leisure Management; of £120,000 on Parks Maintenance; £50,000 additional costs relating to the Centenary Celebrations at Dyffryn Gardens; and of £180,000 on Building Maintenance (Trading Unit).  It was noted that those deficits were to be off-set from underspendings in the Directorate.  The underspending of £333,000 on Policy was mainly attributable to additional external interest earned.  It was further noted that the net overspend of £4.634m. on Community Services would have to be met from the General Fund balance which was predicted to stand on 31st March, 2007 at £5m.  That figure had been arrived at after the use of £2.250m. approved by the Council to balance the 2006/07 budget.  Consequently, attention was drawn to the fact that a substantial amount of the overspend would have to be found by un-earmarking specific reserves. 

 

This was a matter for Executive decision.

 

RESOLVED - T H A T the position with regard to the authority’s 2006/07 Revenue Budget be noted.

 

Reason for decision

 

That Members are aware of the projected revenue outturn for 2006/07.

 

 

C2878                        CAPITAL MONITORING: 1ST APRIL, 2006 TO 31ST DECEMBER, 2006 (CMT) (SCRUTINY - CORPORATE RESOURCES) -

 

Details were presented of the progress on the 2006/07 Capital Programme.  Attention was drawn to the following schemes:

 

·         Penarth Headland Link - the projected outturn for the current financial year was anticipated to be £1,060,000

·         Cowbridge By-Pass, rain activated sign - delays in signing the contract meant that the budget would not be required in the current financial year and the request made that the budget of £26,000 be transferred into the Visible Services Asset Renewal Fund to finance the Pant Y Lladron gully waste disposal reed bed system

·         Disabled Access Audit and Improvements - an anticipated underspend of £50,000

·         Dyffryn Gardens - since the beginning of the scheme, expenditure of approximately £178,000 had been incurred on items of work for which the Heritage Lottery Fund monitoring officer had queried the eligibility for grant draw down; until the position became clear, those costs would be covered by the Project Fund, the Fund being reimbursed accordingly should the Council be successful in recovering any monies

·         Holton Road Christmas Lighting - a budget of £77,000 had been included for decorative Christmas lighting; as the equipment was subject to a three-year finance lease, the required accounting treatment was to capitalise the whole costs within the first year. 

 

During the course of the subsequent discussion, reference was made to the situation at Dyffryn and the need to keep expenditure under scrutiny.

 

This was a matter for Executive decision.

 

RESOLVED -

 

(1)       T H A T the 2006/07 budget of £26,000 for Cowbridge By-Pass rain activated sign be vired to the Visible Services Asset Renewal budget.

 

(2)       T H A T the Cowbridge By-Pass rain activated sign and the remainder of the Pant Y Lladron scheme be given priority to be funded from the 2007/08 Visible Services Asset Renewal Fund.

 

(3)       T H A T the position regarding Dyffryn Phase 1 be noted and further information presented to Members of Cabinet on the overall position.

 

Reasons for decisions

 

(1)       To allow schemes to be undertaken/completed in the future financial year.

 

(2)       To allow schemes to be undertaken in this financial year.

 

(3)       To be aware of the current position.

 

 

C2879                        EXCLUSION OF PRESS AND PUBLIC -

 

RESOLVED - T H A T under Section 100A(4) of the Local Government Act 1972, the press and public be excluded from the meeting for the following items of business on the grounds that they involve the likely disclosure of exempt information as defined in Part 4 of Schedule 12A (as amended) of the Act, the relevant paragraphs of the Schedule being referred to in brackets after the minute heading.

 

 

C2880                        PENARTH ESPLANADE: PIER PAVILION AND ITALIAN SHELTER (DEER) (EXEMPT INFORMATION - PARAGRAPH 21) (SCRUTINY - ECONOMY AND ENVIRONMENT) -

 

Progress in respect of the above was submitted for consideration.  Cabinet had, in October, 2006 requested a report on progress in respect of negotiations on the Pier Pavilion and the Italian Shelter to be submitted to a future meeting (Minute No. C2718).  Details of the relevant issues and options were contained in the report.  The sole party who had previously expressed an interest in the Pier Pavilion had subsequently withdrawn that interest and the only party to continue to express an interest was Penarth Arts and Crafts Limited (PACL).  Discussions had been held with PACL and its vision and proposals for the Pier Pavilion (as appended to the report) appeared to have considerable potential, especially given the positive discussions PACL had had with the Heritage Lottery Fund (HLF), and thereby the opportunity of bringing major investment for the Pier Pavilion.  The HLF had advised PACL to apply for the Project Planning Grant (up to a value of £50k.) which would require match funding of a minimum of 10%.  It was noted that there would be additional important information required to progress the project from project development stage to the project implementation stage and, to that end, to enable reasonable progress of the development stage of the project, a Partnership approach might be appropriate between PACL and the Council.  The aim of the Partnership would be to achieve a high quality restoration of the Pier Pavilion and a beneficial public use run on a long term lease by a type of legal trust.  As regards the Italian Shelter, Heads of Terms of the lease had been agreed in April 2006 subject to the conclusion of the necessary legal agreements by a set deadline which had actually elapsed in October 2006.  Negotiations with the prospective lessee were ongoing but it was noted that, if the matter were unable to be satisfactorily progressed, consideration would need to be given to remarketing the Shelter. 

 

This was a matter for Executive decision.

 

Having regard to the above and to the remainder of the report, it was

 

RESOLVED -

 

(1)       T H A T the Directors of Environmental and Economic Regeneration and Finance, ICT and Property in consultation with the Leader and the Cabinet Member for Policy and Regeneration be authorised to agree Heads of Terms for the Council to form a Partnership Agreement with PACL without prejudice with the aim of restoring the Pier Pavilion and bringing it back into beneficial public use, and that the Pier Pavilion be not advertised until reasonable time had been allowed for the Partnership to make progress.

 

(2)       T H A T the Directors of Environmental and Economic Regeneration and Finance, ICT and Property in consultation with the Leader and Cabinet Member for Policy and Regeneration progress contract negotiations with the party with whom Heads of Terms had been agreed for the lease of the Italian Shelter, that the other formal bids be re-explored to determine if they were viable and reasonable and, should a way forward not be found, that the Italian Shelter be remarketed. 

 

(3)       T H A T the Director of Legal and Regulatory Services be authorised to prepare, complete and execute all relevant documents involved in the legal arrangements following from resolutions (1) and/or (2) above.

 

(4)       T H A T an “Active Citizenship” Grant of £50,000 be awarded to Penarth Arts and Crafts Limited towards a Project Planning Grant with the aim of bringing the Pier Pavilion back into beneficial public use.

 

Reasons for decisions

 

(1&2)  In order to determine a way forward.

 

(3&4)  To enable progress.

 

 

C2881                        ADVENTURE GOLF - BARRY ISLAND (DEER) (EXEMPT INFORMATION - PARAGRAPH 16) (SCRUTINY - ECONOMY AND ENVIRIONMENT) -

 

Approval was sought to enter into an Agreement with a single supplier for the provision and management of an adventure golf facility at Barry Island.  Cabinet had, in July 2006, authorised the Directors of Environmental and Economic Regeneration and Finance, ICT and Property to progress negotiations with North Valley Leisure for a possible installation of an adventure golf facility at the existing site on Barry Island (Minute No. C2587).  The Company had now provided a formal proposal, a copy of which was appended to the report.  The proposal appeared to represent a significant opportunity to build on the excellent work that had already been undertaken in the Barry Island area and authority was therefore sought to terminate the existing concession agreement for the crazy golf facility and to enter into a 25 year agreement with North Valley Leisure for the construction and management of a new adventure golf development at the site.  It was also noted that the rental per annum was index-linked and that the offer from North Valley Leisure in financial terms represented good value for money.

 

This was a matter for Executive decision.

 

Having regard to the above and the remainder of the report, it was

 

RESOLVED -

 

(1)       T H A T the Director of Legal and Regulatory Services be authorised to serve notice of termination of the current licence agreement for the crazy golf concession at Barry Island.

 

(2)       T H A T the Director of Environmental and Economic Regeneration, in consultation with the Director of Finance, ICT and Property, be authorised to negotiate and agree Heads of Terms with North Valley Leisure for the construction, management and operation of the new adventure golf facility for a 25 year period.

 

Reasons for decisions

 

(1)       To terminate the existing crazy golf concession agreement.

 

(2)       To ensure the appropriate construction and operation of the facility protecting the Council’s interest in the land asset.