SCRUTINY COMMITTEE
(LIFELONG LEARNING)
MINUTES of a meeting held on 28th
November, 2007.
Present: Councillor A.D. Hampton
(Chairman); Councillor E. Hacker (Vice-Chairman); Councillors Mrs.
M.E.J. Birch, Ms. R.M. Birch, J. Clifford, A.M. Ernest,
F.T. Johnson, G.C. Kemp, Mrs. S.I. Sharpe, B.I. Shaw
S.T. Wiliam and E.T. Williams.
Non-Voting Observers: Mr. G. Beaudette
and Mr. T. Cox.
569 APOLOGIES FOR
ABSENCE -
These were received from Councillors P.
Church, Miss. J. Cole, A.D. Dobbinson, N.J. Gibbs and A.G.
Powell.
570 MINUTES -
RECOMMENDED - T H A T the minutes of the
meeting held on 5th November, 2007 be approved as a
correct record subject to it being recorded that Councillor S.T.
Wiliam had tendered his apologies for absence.
571 DECLARATIONS OF
INTEREST -
The following Councillors declared the nature
of their interest, being governors of schools within the Vale of
Glamorgan, it being noted that the Standards Committee on
9th September and 21st October, 2004,
13th January 2005 and 5th February 2007 had
granted them a general dispensation to vote upon any matters to be
considered by the Scrutiny Committee (Lifelong Learning) in
relation to matters of a general education nature in terms of
policy, plans, policy framework and budgets, etc.
Councillors A.D. Hampton, E. Hacker, Mrs.
M.E.J. Birch, Ms. R.M. Birch, J. Clifford, A.M. Ernest, F.T.
Johnson, G.C. Kemp, B.I. Shaw, S.T. Wiliam and E.T. Williams.
Councillors J. Clifford and Mrs. S.I. Sharpe
declared an interest in that part of Agenda Item No. 7 that related
to Cowbridge Comprehensive School in view of their membership of
the Trust Committee.
572 COLDBROOK
CATCHMENT FLOOD RISK MANAGEMENT GROUP -
RECOMMENDED - T H A T the minutes of the
meeting of the Coldbrook Catchment Flood Risk Management Group held
on 6th November, 2007 be received.
“Present:
|
Councillors R.F. Curtis
|
|
|
Councillor A.D. Dobbinson
|
|
|
Councillor Mrs. A. Moore
|
|
|
Councillor N. Moore
|
|
|
Councillor Mrs. M.R. Wilkinson
|
|
|
Mr. M. Cadogan
|
Environment Agency Wales
|
|
Mr. T. England
|
Environment Agency Wales
|
|
Mr. P. Kemp
|
Dwr Cymru
|
|
Mr. M. Davies
|
Dwr Cymru
|
|
Mr. M. Punter
|
Head of Visible Services
Vale of Glamorgan Council
|
|
Mr. A. Bosley
|
Senior Engineer
Vale of Glamorgan Council
|
|
Mr. M. Clinch
|
Headteacher
St.Richard Gwyn High
School
|
|
Mr. M. Haynes
|
Property Officer
Vale of Glamorgan Council
|
|
Ms. S. Wood
|
Resident
|
|
Ms. M. Brown
|
Resident
|
|
Ms. A. Usher
|
Resident
|
|
Ms. K. Denman
|
Resident
|
|
Ms. N. Shields
|
Resident
|
|
Ms. J. Cottle
|
Resident
|
(a)
Welcome -
Councillor Curtis welcomed all present to
the first meeting of the Coldbrook Catchment Flood Risk Management
Group, established by the Council.
It was hoped that the Group would meet on
a bi-monthly basis.
(b)
Apologies -
Apologies for absence were received from
Mr. S. Blakeman and Dr. P. Jones (Welsh Assembly Government (WAG))
and Councillor F.T. Johnson.
(c) Terms of
Reference -
It was explained that the Group had been
established to consider water management proposals within the
Coldbrook Catchment area only. Matters concerning other
catchment areas were being considered by other means.
It was the wish of the Council that the
Management Group act to take things forward, and did not dwell on
the past.
It was also the wish of WAG that the
residents be involved in arriving at solutions to the
problems.
AGREED - T H A T the Terms of Reference be
as follows:
(i)
Purpose of Management Group
To act as a consultative forum for water management proposals
within the Coldbrook Catchment and surrounding areas.
(ii) Aims and
Objectives
To act as a sounding board for new ideas and proposals.
To be an integral part of the collective
decision making process in respect of any proposed remedial
measures or engineering works for the catchment.
To assist in enabling the various partner
organisations to reduce and manage the future risks posed by heavy
rainfall events within the catchments.
To assist in communicating the positive
work of the Group to the wider catchment community.
(iii)
Who are we?
The Group comprises
·
senior officers of the Vale of Glamorgan Council, The
Environment Agency, Welsh Water and the Welsh Assembly,
·
elected Vale of Glamorgan Members for the Gibbonsdown, Dyfan,
Cadoc and Court Wards,
·
representatives from the local community and local
schools,
·
as and when required representatives from the Civil
Contingencies Unit and the Emergency Services.
(iv)
What do we do?
The Group will provide a forum where
residents can input into the flood management decision making
process.
The Group will consider the larger picture
(strategic direction) in respect of flooding prevention.
The Group will assist in the dissemination
of information between residents within the catchment and the
Group.
(v) What we
do not do
·
It is not a forum for complaints
·
It is not to seek to apportion blame
·
It is not do deal with problems of individuals or single
properties
·
It is not to concentrate on the past.
(vi)
Control and Communications
The Cabinet Member for Visible Services will chair meetings and
agendas and minutes will be produced and sent out by the Vale of
Glamorgan Council.
(vi)
When will the Group Meet?
Bi-monthly.
The Group would also invite the
Headteachers of Ysgol Gwaun y Nant and Oakfields Primary Schools to
attend meetings together with representatives of the Civil
Contingencies and Emergency Services.
(d)
Responses to the Event of 20th July, 2007
-
The responses of the Council in relation
to the flooding event were to be reported to the Council’s Scrutiny
Committee (Economy and Environment) on 13th November,
2007.
A representative of the Environment Agency
advised that the level of rainfall on 20th July, 2007
had amounted to 83mm. Previous highest levels of rainfall had
been 76mm in 1976 and 51mm in 1998.
The catchment area had been extremely
saturated, and water ran-off very quickly. Of particular
significance was the area where the rain fell. It was alleged
that, if the rain had fallen as little as one mile away, there
would have been no flooding.
It was felt that figures on climate change
suggested that such incidents may occur again, albeit over small
areas. The figures were not available to suggest what the
annual probability of such occurrences would be. It was
acknowledged that flooding could not be prevented, but some levels
of control should be introduced.
Ms. Brown, in referring to the drains,
claimed that residents had never seen gully emptiers operating in
the area, and alleged that some culverts had collapsed. With
the onset of winter, Ms. Brown feared a recurrence of the
problem.
In response, the Head of Visible Services
acknowledged the need for a larger culvert in the area behind Ms.
Brown’s house. Damage to a pipe had also been noticed in the
area (on private land) and the Council was hoping to repair it
soon.
The Council had allocated a sum of £25,000
for immediate works.
Ms. Brown also stated that there should
have been a sensor in the storm tank.
Mr. Davies of Dwr Cymru, in response
stated some £10m. had been spent on installing water storage
tanks. The largest Controlled Sewerage Overflow tanks did not
require alarms, but nevertheless one had been fitted to the
controlled Sewerage Overflow in the tank at the end of Daniel
Street.
Ms. Usher enquired as to what had been
used as topsoil over the tanks as the newly laid material was not
water retentive.
Mr. Davies of Dwr Cymru stated that he
would make enquiries as to what had been laid.
Ms. Wood referred to an area of land which
was always wet.
Mr. Davies of Dwr Cymru offered to speak
to any of the residents about specific matters outside of the
meeting.
Councillor N. Moore asked if the level of
run-off was considered when overflow tanks were installed, and was
advised that the footprint of the tanks was so small there was
little effect. Also, the tanks would be covered by porous
material.
Councillor N. Moore, whilst acknowledging
that the level of rainfall was exceptional, commented on the
sewerage rising from the drains in his Ward in Coldbrook Road
East. Councillor Moore enquired if this was due to the
overflow tanks.
Mr. Kemp of Dwr Cymru felt that it was
difficult to predict what would happen in such circumstances.
Events could have been affected by:
-
the bungalows built in the 1950’s
-
drains and overflows could have been overloaded by
rainwater
-
additional buildings built since the 1950’s
-
other reasons.
(e)
Schools Affected -
Mr. Clinch, Headteacher of St. Richard
Gwyn High School, provided an outline of what had happened at that
school.
Mr. Clinch praised the support received by
the School from the Council.
Mr. Clinch also acknowledged that there
would always be a risk of flooding.
Works had been carried out by Dwr Cymru
some three years ago. Mr. Clinch acknowledged that on
this occasion, no sewerage had been involved in the flooding
incident at the School.
Mr. Haynes spoke of the flooding effects
on Oakfield Primary School, Ysgol Gwaun y Nant and Bryn Hafren
Comprehensive School.
Oakfield Primary School
had been flooded before.
All schools should be fully open by
Christmas.
Reinstatement works to the schools were
being funded by the insurance companies on a “like for like” basis
which meant there was no possibility of works of improvement taking
place.
Councillor Dobbinson, in relation to
Oakfield Primary School stated that CCTV footage existed of the
flooding incident which should assist in the review process to see
what could be learnt.
In addition, Councillor Dobbinson enquired
if it was true that, in pumping flood water from residents’ houses,
the Fire Service had contributed to the flood waters affecting
Oakfield Primary School. It was
AGREED - T H A T this matter be placed on
the Agenda for the next meeting of the Group, and that
representation of the Fire Brigade be invited to attend.
Councillor N. Moore appealed to anyone
with video footage of any flooding incident to pass it to the
Council.
It was also observed that Fire Engines
from neighbouring areas had attended in Barry to assist with the
flooding. Different fire authority areas had different ideas
of the status of the incident. It was
AGREED - T H A T this was a matter that
warranted further consideration.
(f)
Pre-Feasibility Work
The Head of Visible Services advised that
WAG had awarded the Council a sum of £6,000 to conduct a
feasibility report for the Coldbrook catchment, and all Members of
the Group would have a role to play in its preparation.
Questionnaires had been sent out for
people to provide an account of what had happened on
20th July. The results of the survey would be sent
to WAG following which it may be possible that money would be
provided for improvement works to be undertaken.
It may be that there is a need to retain
water up the catchment or to construct ponds upstream to slow down
the flow of water.
The main priority would be to reduce the
risk of future flooding.
It was not possible to undertake any major
projects prior to the results of the questionnaire being
known.
It was hoped that an analysis of the
questionnaires would be complete by February 2008 and that this
information would then be submitted to WAG.
WAG had expressed the view that
this would provide an ideal “pilot” project and had intimated that
considerable efforts and resources would be devoted.
The view was expressed that, whatever the
cause of flooding had been, the lack of gully-emptying had not been
a contributory factor although it was acknowledged that a number of
gullies may have been blocked.
Furthermore, if the gullies had been
clear, the water would have flowed faster and would have
congregated at a particular spot even faster and with more
force. Members of the Group were advised that photographs of
the inspections undertaken of the culvert would be provided at the
next meeting.
(g)
Residents’ Issues
Ms. J. Cottle of Carew Close spoke of the
drain cover outside her house which is at road level. Much
rubbish blocks the drain, although it was acknowledged that the
Council did unblock the drain.
The Head of Visible Services gave an
undertaking that the drain cover would be inspected.
Ms. K. Denman referred to her street being
flooded by water flowing from Cemetery Road.
The Head of Visible Services replied that
this was a matter that required investigation. The solution
would be to either contain water to the north, or at various points
to prevent the water leaving Merthyr Dyfan lane.
Ms. Brown referred to two drains that had
been covered in tarmac in Cemetery Road.
The Head of Visible Services asked to be
informed of their exact locations.
Councillor Dobbinson referred to works
being carried out at 29 Robbins Lane and enquired if the works had
exacerbated the flooding problem.
The Head of Visible Services advised that
he had concerns about the works being carried out at the property
and the affects of this work would be considered within the
feasibility process.
AGREED - T H A T a report on this matter
be brought before the next meeting of the Group.
(h)
Communications Protocol
It was reported that the minutes of the
meetings of the Group would be distributed as quickly as
possible. The minutes would also be reported to the meetings
of the Scrutiny Committee (Economy and Environment) and Scrutiny
Committee (Lifelong Learning).
(i) Any
Other Business
None.
(j) Date of
Future Meeting
The date of the next meeting would be
distributed to the Members of the Group together with the minutes
of this meeting.”
_________________
573 INITIAL CAPITAL
PROGRAMME PROPOSALS 2008/09 (DFICTP) -
Committee were advised of the progress on the
2007/08 Capital Programme for the period ended 31st
October, 2007 and received for consultation purposes the initial
capital proposals for 2008/09.
Details of progress on the Capital Programme
as at 31st October, 2007 were detailed in Appendix A to
the report.
On 14th November, 2007 the Welsh
Assembly Government had announced the provisional 2008/09 General
Capital Funding. The provisional allocation was £8,198,000
which represented an increase of £23,000 (0.28%) over the current
year. The final settlement was expected to be announced
during January 2008.
In addition to funding from the Welsh Assembly
Government, the Council would finance part of the Capital Programme
from its own resources, e.g. capital receipts and reserves.
Attached at Appendix B to the report were
details of the indicative 2008/09 Lifelong Learning Capital
Programme.
An indicative asset renewal budget of £800,000
had been included in the figures for Schools. This
constituted an un-earmarked general provision.
In addition to the Capital Bids shown at
Appendix B to the report, Appendix C listed Capital Bids received
that had been unsuccessful and which had not been put forward for
inclusion in the 2008/09 Programme. The Corporate Asset Management
Group had prioritised schemes that fell within their remit.
The method of prioritisation used was detailed in the Authority’s
Capital Investment Strategy and was shown in the following
table:
|
Priority Level
|
Criteria
|
|
1.
|
Health and Safety Legislation
|
|
2.
|
Other Legislation / Statutory Requirement
|
|
3.
|
Sufficiency; Corporate Plan; Economic
Sense
|
|
4.
|
Condition; Suitability
|
|
5.
|
Welsh Assembly Government objectives
|
|
6.
|
Low Priority
|
Due to the shortage of Capital Funding, the
only addition to the indicative Capital Programme for 2008/09 was
that of the Relocation of Road to Dunraven Bay, whereby further
costs were required on an already committed scheme.
Council, on 12th October, 2005, had
approved the School Investment Strategy. It approved that the
school development budget be increased by £1,000,000 from 2008/09
onwards. This had been reflected in Appendix B to the
report. The Council also approved that the £9m. one-off
School Building Improvement Grant and £1.4m. of existing useable
capital receipts, be utilised for the School Investment
Strategy. These budgets were also included in Appendix
B. Approval had also been given for capital receipts
generated by schools to be ringfenced for the Investment Strategy
up to £6.5m. and that unsupported borrowing of up to £7.3m. could
be undertaken. Davis Langdon had been appointed as the
Consultant Project Design Team and would now be proceeding with the
design work for Cowbridge Comprehensive School.
RECOMMENDED - T H A T the initial capital
budget proposals be noted and that Scrutiny Committee (Corporate
Resources) and Cabinet be informed accordingly.
Reason for decision
Following full consultation on the future
Capital Programme.
574 INITIAL REVENUE
BUDGET PROPOSALS 2008/09 (DFICTP) -
Committee were advised of the initial budget
proposals for 2008/09 and were informed of the amended original
budget for 2007/08 for services which formed part of the
Committee’s remit.
Appendix 1 to the report set out the necessary
transfers to the original estimate for 207/08, which were required
to be made as follows:
·
Asset Rents - the main reason for this movement was due to
revisions to the Accounting Code of Practice that required deferred
government grant income to be released to Revenue Services which
offset the asset rent already charged.
·
Recharges etc. - movement in charges between internal Council
services.
·
Budget Transfers - budget adjustments to reflect transfers of
functions and responsibilities between services. Primarily,
this related to:
- the
transfer from Human Resources and Equalities to Finance - TransAct
staff (£227,000) and to Chief Executive - Equalities
(£191,000).
The additional pressure arising from the
increased price of care home fees could not be predicted at the
beginning of the year. It was unrealistic, at this point in
the year, to expect Social Services to cover these costs within
their existing budget. Therefore, it was proposed that an
additional allocation of £1.11m. be given to Social Services in
2007/08 to cover these costs and those of the arbitration. It
was noted that this increase was for 2007/08 only and Social
Services would need to identify savings to cover the additional
costs in future years.
It was essential that early measures be taken
to bring down spending, in view of the predicted poor settlement
and current financial position. Consequently, following
discussions with the individual directors, it was proposed to set
an additional savings target for 2007/08 as follows:
|
|
£’000
|
|
Environmental and Economic Regeneration
|
650
|
|
Legal, Public Protection and Housing
|
200
|
|
Finance, ICT and Property
|
200
|
|
Chief Executive
|
60
|
The total target savings above totalled
£1.11m. They equated to approximately 2% of the individual
budgets.
Social Services had not been given an
additional savings target and would need to bring a revised Budget
Action Plan to Cabinet setting out how they intended to bring their
expenditure down to their revised target. However, a
moratorium on the filling of all vacant posts within the
Directorate had been put in place, with the exclusion of staff in
residential homes and in other exceptional circumstances.
Learning and Development had similarly not
been given an additional savings target. The bulk of the
budget had already been delegated to Schools for 2007/08. The
Director would produce a Budget Action Plan setting our how
expenditure within Lifelong Learning an Catering would be brought
within budget. A moratorium on the filling of all vacant
posts within the Directorate had been put in place, with the
exclusion of exceptional circumstances.
The following table compared the amended
original budget with the projected outturn for 2007/08:
|
|
2007/08
|
2007/08
|
Variance
|
|
|
Amended Original
Budget
|
Projected
Outturn
|
(+)Favourable
(-)Adverse
|
|
|
£’000
|
£’000
|
£’000
|
|
Learning and Development
|
|
|
|
|
Education and Schools
|
82,125
|
81,858
|
+267
|
|
Libraries
|
2,561
|
2,561
|
0
|
|
Lifelong Learning
|
1,900
|
2,047
|
-147
|
|
Catering
|
1,075
|
1,195
|
-120
|
|
Human Resources and Equalities
|
0
|
0
|
0
|
Education and Schools - although there were a
number of pressures on the service the expenditure on placements in
independent schools included in the Access and Inclusion budget was
forecast to be £130,000 less than was estimated. This was due
to a number of pupils returning to placements within the
Authority. At present there was also potential income of
£350,000 as a result of more out of county pupils. However,
given the volatile nature of this budget, the income was not
considered secure at this time. In addition, within the
Strategic Planning and Performance budget, as a result of the
combination of a recent re-tendering exercise on certain home to
school transport routes and contract inflation for all other routes
being lower than expected, there was a projected saving of £137,000
on home to school transport. The education base budget
currently included £450,000 to support the School Investment
Strategy. In 2007/08 the budget would be used to help fund
the costs of the external design team. From 2008/09 it would
be available to support Prudential borrowing.
Lifelong Learning - the service continued to
predict a potential adverse variance of £147,000 due to delay in
starting the new learning programmes to the economically inactive
and low enrolments over the summer period - £51,000 to premises
costs at the Heritage Skills Centre - £9,000 and the costs of the
Vale Learning Network - £87,000. The Director of Learning and
Development had advised that actions would be implemented in an
effort to reduce this figure and consequently reduce the support
needed from the Strategy and Performance budget.
Catering - an adverse variance of £120,000 was
predicted for this service. This was due to reduced meal
numbers not yet recovering to the previous levels and additional
cost pressures on food and staff resources resulting from the
implementation of Welsh Assembly Nutritional guidelines.
There was currently a projected overall
deficit of £168,000 that would need to be funded from the reserves,
in addition to the £450,000 required to balance the 2007/08
budget. General reserves as at 1st April 2007
amounted to £5.7m. and consequently as a prudent minimal level for
the General Reserve is £4m. Some specific reserves would need
to be “un-earmarked”.
The budget strategy and timetable for 2008/09
had been approved by Cabinet on 25th July, 2007 as part
of the 2007/08 - 2010/11 Medium Term Financial Plan (Minute No.
C3160).
The Budget Strategy for 2008/09 outlined
that:
·
in order to establish a baseline, services should prepare initial
revenue budgets based on the cost of providing the current level of
service and approved policy decisions. This meant the cost of
price increases and pay awards should be included.
·
Increases to budgets approved during the course of a financial year
could restrict the freedom the Council had to allocate its
resources to priorities during the following budget cycle when it
was aware of all the competing demands. Consequently:
-
supplementary estimates would only increase the base budget if
Council had given specific approval to this effect. Increase
met by virement within a year would not be treated as committed
growth.
-
Directors should find the cost of increments and staff changes from
their base budget unless the relevant specific approval had been
given for additional funding.
-
The effect of replacing grant from outside bodies that had
discontinued would not be treated as committed growth. In
addition, before any project or initiative that was to be met
either wholly or partly by grant may proceed the exit strategy must
be approved.
-
Certain items of unavoidable committed growth would continue and
these include the effect of interest charges and the financing
charges of the Capital Programme, increases in taxes, increases in
levies and precepts charged by outside bodies and changes to
housing benefits net expenditure.
-
Services would be expected to identify and achieve recurrent
efficiency savings equivalent to at least 2% of their budget and
Schools should plan for efficiency savings of at least 0.3%.
·
The costs of service development would need to be met from within
the respective services from savings that they identified; in
addition works may need to be prioritised within a service to meet
any higher priority demands. Services had therefore been
asked to identify any burgeoning revenue cost pressures.
A summary of the overall base budget for
2008/09 was attached at Appendix 2 to the report. This had
been arrived at by adjusting the 2007/08 budget for items such as
inflation and unavoidable growth.
Inflation amounted to £0.460m. of which
£0.304m. related to pay awards and £0.156m. for general price
increases. It was noted that these figures excluded inflation
for Schools, which was dealt with as a “Cost Pressure”.
A list of the 2008/09 Cost Pressures as
identified by the Service was attached to the report at Appendix
3. These were not shown in any order of priority and included
costs relating to Social Services that were a continuation of the
level of overspending in 2007/08. Altogether these totalled
£4.594m. and some would need to be met for some services.
They excluded the cost of redundancies, which may be incurred in
order to maintain the budget within the resources available.
It was noted that these costs could be significant.
Having considered the detail of the report,
Members welcomed the continued high level of delegation of
resources to Schools, but noted with concern that the actual level
of funding to individual Schools was still one of the lowest in
Wales.
Despite the Service being starved of
resources, the service still had to respond to Welsh Assembly
Government initiatives, which devoted a great deal of management
time.
As such, Committee noted that the moratorium
of the filling of vacancies would cause problems to the Service at
a strategic level.
RECOMMENDED - T H A T the initial Revenue
Budget Proposals for 2008/09 be noted.
Reason for decision
In order that Cabinet be informed before
making a final proposal on the budget.
575 SCHOOLS CAPITAL
INVESTMENT STRATEGY - UPDATE (DLD) -
Committee were updated of progress on the
School Investment Strategy.
The programme of work had commenced with
Cowbridge School. The Design Team had already made an initial visit
to the School. The first stage of the design process was an
option appraisal and preparation of a detailed project plan.
The key purposes of the options appraisal included enabling the
Council to effectively minimise risks associated with the
re-development of Cowbridge School and gain better certainty over
construction costs.
Once the most appropriate option was approved
by the Council, Davis Langdon would take the design of the school
up to full planning application. Thereafter, the Council
would secure a design and build contractor to complete the final
design and undertake the construction work. The scheduled
completion of Cowbridge School was September 2010. The
school, parents and governors of Cowbridge School had been updated
on progress.
Once the costs of Cowbridge School were known
with greater certainty, then the Council would be in a position to
confirm the phasing of the other two Secondary Schools, St. Cyres
and Llantwit Major. In the meantime, Davis Langdon would
commence an option appraisal at St. Cyres in the early part of 2008
and prepare for a further options appraisal at Llantwit Major.
RECOMMENDED - T H A T the contents of the
report be noted.
Reason for decision
So that Committee are aware of progress on the
School Investment Strategy.
576 SCHOOL BUDGETS
2007/08 (DLD) -
Dr. V. Browne, Headteacher of Llantwit Major
School was in attendance, representing the School Budget Forum.
Members were advised of the financial state of
School Budgets in the current 2007/08 financial year.
In terms of overall education and schools
expenditure, the year on year increase for the Vale of Glamorgan
had consistently been above average and within the top few
authorities across Wales. In 2007/08, the net increase in
education funding for the Vale was 4.0%. Although not as
highly ranked as previous years, nevertheless this was the
8th highest in Wales and compared to the Welsh average
of 3.8%. The Vale of Glamorgan had always been a consistently
high delegator of resources to schools. In 2007/08 the Vale
of Glamorgan delegated a proportional rate of 82.5% which was the
highest in Wales.
Despite the relatively high proportional
budget increase described above, in actual cash terms schools in
the Vale of Glamorgan continued to be relatively poorly off in
comparison to schools in other local authorities. Comparison
of the variance of the funding per pupil in the Vale of Glamorgan
with the Wales average is summarised below:
|
|
2007/08
|
2006/07
|
2005/06
|
2004/05
|
|
Total £ / Pupil
|
-60
|
-77
|
-114
|
-142
|
|
Primary £ / Pupil
|
-127
|
-92
|
-67
|
-152
|
|
Secondary £ / Pupil
|
-202
|
-233
|
-300
|
-250
|
An analysis of school balances was provided at
Appendix 3 to the report. As at the end of the 2006/07
financial year, the aggregate primary school balances stood at
£1.695m. They were projected to drop to £0.817m. by March
2008.
For the secondary sector, the aggregate school
balances were £0.076m. at the end of the 2006/07 financial year and
was forecast to drop to £0.238m. deficit by the end of March
2008. Schools in the Vale of Glamorgan were prudently and
effectively managing their school budgets from the financial
perspective. However, the Budget Forum were concerned that
the level of funding was detrimental to the educational curriculum
development in schools. The Budget Forum believed that pupils
in the Vale of Glamorgan were being disadvantaged in comparison
with pupils in Wales due to the low level of funding. The
impact of this disadvantage would increase as schools in the Vale
were unable to fully fund developments in areas such as ICT, and
key curriculum development.
Dr. V. Browne, on behalf of the Schools Budget
Forum, referred to two significant issues:
-
funding for schools was not adequate (although Dr. Browne did not
blame the Vale of Glamorgan Council for this)
-
it was recognised that money allocated to the Council for education
purposes was not diverted away to other areas of the Council.
Dr. Browne ventured that there must be a basic
amount required to provide a given level of education.
The Budget Forum was often informed that
representations were to be made to WAG on issues, but had never
been involved in the making of representations nor informed of the
outcomes of the representations.
Dr. Browne requested that, in future, the
Budget Forum have a greater involvement when representations were
made.
Dr. Browne also referred to proposals being
developed by the School Budget Forum for an increase in funding for
the Secondary Sector of 2%, and the Primary Sector of 1% over the
next three years. Although the details of the proposals was
not finalised, Dr. Browne asked the Committee for “in principle”
support for the proposals which were to be made to the Leader and
Deputy Leader of the Council in the near future.
Following discussions, it was
RECOMMENDED -
(1) T H A
T the contents of the report be noted with concern.
(2) T H A
T Cabinet be requested to support the request of the School Budget
Forum that it take a more involved role when representations are
made to the Welsh Assembly Government.
(3) T H A
T Scrutiny Committee (Lifelong Learning) supports the efforts of
the School Budget Forum to increase the level of funding for the
Secondary and Primary Sector.
(4) T H A
T the WAG Minister for Children, Education, Lifelong Learning and
Skills be invited to address a future meeting of the Scrutiny
Committee (Lifelong Learning).
Reasons for decisions
(1) Having
considered the contents of the report.
(2) To
further involve the School Budget Forum in its efforts.
(3) To
support the work of the School Budget Forum.
(4) To
permit the Minister to advise of the WAG funding methods.
577 WORK PROGRAMME
-
Having noted that the Committee did not have a
current work programme, the Chairman invited Members to suggest
items that could be considered in greater depth.
Suggestions offered included:
-
Library Standards
-
School attendance
-
The Foundation Phase
-
Home tuition
-
Exclusions
-
The Green Room.
RECOMMENDED - T H A T the Director be
requested to provide a brief covering report on each of the above
topics to further inform the Committee prior to a decision being
made on items to be included in a work programme for the
Committee.
Reason for decision
To assist in the development of a work
programme for the Committee.